
NuScale Power Places First Long Lead Material Production Order with Doosan Enerbility
9.3.2023 22:15:00 CET | Business Wire | Press release
NuScale Power Corporation (NYSE: SMR), the industry-leading provider of proprietary and innovative advanced nuclear small modular reactor (SMR) technology, today announced that at the end of 2022, as scheduled, it placed the first upper reactor pressure vessel (RPV) long lead material (LLM) production order with Doosan Enerbility (Doosan), a world-class manufacturing and engineering company. The order is for materials essential to commence manufacturing of the first NuScale Power Modules that are scheduled to be in commercial operation at the Utah Associated Municipal Power Systems’ Carbon Free Power Project as early as 2029. In addition, NuScale and Doosan are aligned to manufacture additional modules for future NuScale VOYGR™ SMR power plant projects with similar delivery dates.
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20230309005685/en/
“Finalizing and submitting this order to our valued partner, Doosan, showcases NuScale’s transition to the manufacturing phase of our modules and highlights our advanced position in the market to deploy our SMR technology to customers by the end of the decade,” said John Hopkins, President and Chief Executive Officer of NuScale. “Our strong relationships with experienced partners like Doosan demonstrate NuScale’s robust global supply chain and positions us to meet the growing interest for NuScale VOYGR power plants that we are seeing around the world.”
“The U.S. Nuclear Regulatory Commission (NRC) recently issued a final rule to certify NuScale's innovative SMR design, which gives testament to NuScale’s status as the leading technology in the global SMR market,” said Jongdoo Kim, Head of Doosan Enerbility’s Nuclear Business Group. “Doosan is proud to take part in the construction of a NuScale SMR, offering clean and carbon-free energy projects to tackle climate change.”
In preparation for the long lead order, NuScale and Doosan initiated an effort in April 2022 to complete the manufacturing for the forging dies for the upper RPV. Building on this completion, the new LLM order includes heavy forgings, steam generator tubes, and weld material for six upper RPVs. The total estimated weight of the materials for six upper RPVs is more than 2,000 tons.
In addition to Doosan, NuScale continues to strengthen its supply chain readiness through coordination with its robust list of world-class suppliers and manufacturers in the U.S. and abroad.
About NuScale Power
NuScale Power Corporation (NYSE: SMR) is the industry-leading provider of proprietary and innovative advanced small modular reactor nuclear technology, with a mission to help power the global energy transition by delivering safe, scalable, and reliable carbon-free energy. The company’s groundbreaking VOYGR™ SMR plants are powered by the NuScale Power Module™, a small, safe, pressurized water reactor that can each generate 77 megawatts of electricity (MWe) or 250 megawatts thermal (gross), and can be scaled to meet customer needs through an array of flexible configurations up to 924 MWe (12 modules) of output.
As the first and only SMR to have its design certified by the U.S. Nuclear Regulatory Commission, NuScale is well-positioned to serve diverse customers across the world by supplying nuclear energy for electrical generation, district heating, desalination, commercial-scale hydrogen production, and other process heat applications.
Founded in 2007, NuScale is headquartered in Portland, Ore. To learn more, visit NuScale Power’s website or follow us on Twitter, Facebook, LinkedIn, Instagramand YouTube.
About Doosan Enerbility
Doosan is a leading Engineering, Procurement and Construction (EPC) contractor offering a wide range of services ranging from the manufacturing of castings and forgings, power generation systems and desalination facilities to the construction of power plants.
Doosan maintains a high quality standard based on extensive experience in manufacturing major components of nuclear power plants. Doosan has an integrated manufacturing facility in Changwon, Korea, which is capable of raw material production to final assembly of nuclear components. Doosan has manufactured and supplied 34 Reactor Vessels & 124 Steam Generators globally.
Forward Looking Statements
This release may contain “forward-looking statements” within the meaning of the “safe harbor” provisions of the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements may be identified by the use of words such as “estimate,” “plan,” “project,” “forecast,” “intend,” “will,” “expect,” “anticipate,” “believe,” “seek,” “target” or other similar expressions that predict or indicate future events or trends or that are not statements of historical facts. These forward-looking statements are inherently subject to risks, uncertainties and assumptions. Actual results may differ materially as a result of a number of factors. Caution must be exercised in relying on these and other forward-looking statements. Due to known and unknown risks, NuScale’s results may differ materially from its expectations and projections. NuScale specifically disclaims any obligation to update these forward-looking statements. These forward-looking statements should not be relied upon as representing NuScale’s assessments as of any date subsequent to the date of this release. Accordingly, undue reliance should not be placed upon the forward-looking statements.
To view this piece of content from cts.businesswire.com, please give your consent at the top of this page.
View source version on businesswire.com: https://www.businesswire.com/news/home/20230309005685/en/
Contact information
Media Contact
Diane Hughes, Vice President, Marketing & Communications, NuScale Power
dhughes@nuscalepower.com
(503) 270-9329
Investor Contact
Scott Kozak, Director, Investor Relations, NuScale Power
skozak@nuscalepower.com
(541) 452-7583
Doosan Media Contact
Jiho Jang, Nuclear Sales & Marketing Team 2
jiho.jang@doosan.com
About Business Wire
(c) 2018 Business Wire, Inc., All rights reserved.
Business Wire, a Berkshire Hathaway company, is the global leader in multiplatform press release distribution.
Subscribe to releases from Business Wire
Subscribe to all the latest releases from Business Wire by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from Business Wire
H.I.G. Capital Announces the Sale of DGS S.p.A.11.6.2024 12:00:00 CEST | Press release
H.I.G. Capital (“H.I.G.”), a leading global alternative investment firm with $62 billion of capital under management, is pleased to announce that an affiliate has signed a definitive agreement to sell its portfolio company, DGS S.p.A. (“DGS” or the “Group”), a leading firm in the Italian Information Technology market, to DGS Co-Founders and management team in partnership with ICG, a global alternative asset manager. Since its inception in 1997, DGShas supported blue-chip customers in the design, integration, and maintenance of complex IT systems, with a specialization in digital transformation and cybersecurity services. The Group currently has over 1,900 employees, revenues of approximately €300 million, and maintains a group of highly loyal clientele. During H.I.G.’s ownership, DGS has tripled in size and consolidated its position as a leading Italian firm in cybersecurity services and digital transformation. DGS offers its clients sophisticated and proprietary digital transformation
Evertas Names Nick Selby Head of European Underwriting11.6.2024 12:00:00 CEST | Press release
Evertas, the world’s first crypto insurance company, has named Nick Selby as its new Head of European Underwriting. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240611141887/en/ Nick Selby, Executive Vice President and Head of European Underwriting at Evertas (Photo: Business Wire) Selby, an accomplished information and physical security professional, brings two decades of expertise in public and private sector information security, physical security, and complex incident handling, as well as seven years of experience leading teams securing billions of dollars in cryptoassets. Previously, his roles included VP of the Software Assurance Practice at Trail of Bits, Chief Security Officer at Paxos Trust Company, and Director of Cyber Intelligence and Investigations at the NYPD Intelligence Bureau. “Nick is an extremely valuable addition to our European team,” said Evertas CEO and Co-Founder J. Gdanski. “His public and private
Owlet utvider globalt fotavtrykk med lanseringen av medisinsk-sertifisert Dream Sock™ i Storbritannia og over hele Europa11.6.2024 11:00:00 CEST | Pressemelding
Owlet, Inc. («Owlet» or the «Company») (NYSE:OWLT), pioneren innen smart spedbarnsovervåking, kunngjør i dag den britiske og europeiske lanseringen av Dream Sock. Dette er en smart babymonitor med levende helseavlesninger og varsler for friske spedbarn mellom 0-18 måneder og 2,5-13,6 kg. Dette innovative medisinske utstyret gir foreldre helse og viktig informasjon i sanntid, noe som gir uovertruffen trygghet. Denne pressemeldingen inneholder multimedia. Se hele pressemeldingen her: https://www.businesswire.com/news/home/20240611820341/no/ (Photo: Business Wire) «Vi er svært stolte over å lansere Dream Sock til omsorgspersoner over hele Storbritannia og Europa og gi millioner av foreldre mer trygghet mens babyen sover,» sa Kurt Workman, Owlets administrerende direktør og medgründer. «Dream Sock er nå et globalt produkt som er anerkjent som medisinsk nøyaktig og trygt, etter å ha gjennomgått regulatoriske autorisasjoner og sertifiseringer innenfor flere geografier. I dag er misjonen vår
V-Nova Surpasses 1000 Patent Milestone in Media Technology Innovation11.6.2024 10:00:00 CEST | Press release
V-Nova, a leading provider of data compression solutions, video compression technology, XR technology, AI acceleration and parallel processing for a multitude of industries including media and entertainment, today announced its milestone achievement of 1000 active technology patents. This accomplishment underscores V-Nova’s dedication to research and development and its commitment to protecting its intellectual property globally. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240611724561/en/ V-Nova’s patent portfolio spans more than 50 different jurisdictions. Including over 400 patents in Europe, over 200 in the Americas, over 100 in the United States specifically, and over 200 in Asia. V-Nova forged new directions in data processing to enhance digital experiences, maximize efficiency, reduce costs, and increase sustainability. The company leads the way with key international data compression standards for the video indust
Alipay+ Reveals Top Scorer Trophy Design for UEFA EURO 2024™11.6.2024 09:24:00 CEST | Press release
Alipay+, a suite of cross-border mobile payment and digitalization technology solutions operated by Ant International and an Official Partner of UEFA EURO 2024™, today revealed the trophy that will be awarded to the most prolific marksman at the UEFA EURO 2024™ finale on July 14 in Berlin, Germany. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240610328619/en/ The UEFA Top Scorer Trophy presented by Alipay+ is unveiled for UEFA EURO 2024™ (Photo: Business Wire) Sculpted in the shape of the Chinese character “支” (pronounced zhi, and meaning payment as well as support), the trophy reflects Alipay+’s dedication to supporting consumers to enjoy seamless payment and a broad choice of deals using their preferred payment methods while traveling abroad. The character also resembles the fleeting moment of a barefooted striker poised to shoot, evoking the original beauty and power of football – a game that united people across the wo
Business Wire