New job for hospital in Bergen
1.7.2020 13:29:18 CEST | AF Gruppen ASA | Press release

This constitutes the third contract performed by LAB on behalf of this client in connection with the renovation and expansion of the hospital and VID Specialized University.
The turnkey contract has a value of NOK 129 million excluding VAT.
Contract commencement is scheduled for the start of August 2020 with handover during the third quarter of 2021.
“We look forward to initiating the works that will secure the new, modern premises for the foundation for both healthcare activities and teaching. For a long time, LAB has collaborated with the client on the development and construction work in various stages of the development of the hospital area, and we look forward to the positive collaboration continuing,” says Amund Tøftum, Executive Vice President of AF Gruppen.
Contacts
Gard Kvalheim: Managing Director in LAB Entreprenør AS, tel. +47 907 54 394
Amund TøftumEVP Offshore and Building Norway
Tel:+47 920 26 712Amund.Toftum@afgruppen.noImages
About AF Gruppen ASA
AF Gruppen is a leading contracting and industrial group that was formed by an entrepreneurial spirit and execution capabilities. The group has 5,700 employees and revenue reached NOK 22.5 billion in 2019. AF Gruppen is listed on Oslo Stock Exchange (AFG).
We provide a broad range of services with seven operational business areas: Civil Engineering, Building, Betonmast, Property, Energy and Environment, Sweden and Offshore.
Subscribe to releases from AF Gruppen ASA
Subscribe to all the latest releases from AF Gruppen ASA by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from AF Gruppen ASA
Awarded contract for the refurbishment and extension of Frölundabadet in Gothenburg13.3.2026 13:34:56 CET | Press release
AF Bygg Väst, a subsidiary of AF Gruppen, has been awarded the contract by the City of Gothenburg’s real estate administration to carry out the refurbishment and extension of Frölundabadet in Gothenburg. The contract value is SEK 253 million excluding VAT.
Renovating more student housing in Bergen12.3.2026 10:41:34 CET | Press release
LAB Entreprenør, a subsidiary of AF Gruppen, has entered into an agreement with Sammen, the Student Welfare Organisation of Vestland, for the refurbishment of two residential blocks at Hatleberg in Bergen.
Selected for the construction of phase 2 of Drammen Helsepark25.2.2026 15:44:15 CET | Press release
Strøm Gundersen, a company within AF Gruppen, has been selected to construct the buildings Krafttårnet and Generatoren, which together constitute construction phase 2 of Drammen Helsepark. The client is Drammen Helsepark AS, which has established the project company DHP Bygg BK4‑2 AS as the contracting entity. The contract is valued at NOK 731 million excluding VAT and will be delivered as a turnkey contract. Drammen Helsepark AS is wholly owned by Bane NOR Eiendom AS.
Awarded EPRD contract in the North Sea24.2.2026 08:32:53 CET | Press release
AF Gruppen has, through its subsidiary AF Offshore Decom and in a consortium with Heerema Marine Contractors (HMC), been awarded a contract for the engineering, preparation, removal & disposal (EPRD) of a North Sea platform on the UK Continental Shelf.
AF Gruppen acquires a majority stake in Swedish construction contractor13.2.2026 07:01:00 CET | Press release
AF Gruppen is strengthening its concrete operations in Sweden. AF Bygg Syd AB has entered into an agreement to acquire 70 per cent of the shares in H.A. Bygg Entreprenad AB. The remaining 30 per cent will continue to be owned by the company’s employees.
In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.
Visit our pressroom
