GlobeNewswire by notified

Verisk’s AIR Worldwide Estimates Insured Losses for Hurricane Ida Will Range from USD 17 Billion to USD 25 Billion

Share

BOSTON, Sept. 03, 2021 (GLOBE NEWSWIRE) -- Extreme event modeling firm AIR Worldwide estimates that industry insured losses to onshore property resulting from Hurricane Ida’s winds and storm surge will range from USD 17 billion to USD 25 billion. AIR Worldwide is a Verisk (Nasdaq:VRSK) business. 

AIR’s modeled insured loss estimates include insured physical damage to property (residential, commercial, industrial, auto), both structures and their contents from winds, wind-borne debris, storm surge, and the impact of demand surge. The industry loss estimates also reflect an adjustment to account for increased material and other repair costs in the current construction market. Hurricane precipitation-induced flood losses are not included in AIR estimates at this time.

Ida traveled over very warm Gulf waters, including a thick layer of warm water in the Loop Current, and intensified to make two landfalls in Louisiana, both at Category 4 strength, on August 29. The storm’s first landfall was near Port Fourchon about 60 miles south of New Orleans, with a maximum sustained wind speed of 150 mph; its second landfall was southwest of Galliano, with a maximum sustained wind speed of 145 mph. Around the time of landfall, the storm was undergoing an eyewall replacement. In practical terms, New Orleans experienced strong winds on the order of 90 to 100 mph due to the large windfield and a slow decay of the storm.

The storm surge Ida produced was along expected lines and generally not as severe as Hurricane Katrina’s—particularly in Mississippi and New Orleans (the latter of which was fully protected by the city’s levee system)—but some areas of southeastern Louisiana with insufficient protection experienced severe storm surge during Ida. 

According to analysis by Wood Mackenzie, a sister company in the Verisk family, Hurricane Ida has had a significant impact on Louisiana refinery operations and Gulf of Mexico production, causing a historic U.S. crude supply chain disruption. Utility disruptions caused by lack of power, mobile data services, and water, could lead to Ida becoming a long-tailed event when it comes to claims reporting, payouts, etc. 

While New Orleans’ levees held, the city was not spared Ida’s wind impacts. Damage was variable given the nature of building inventory in the metro New Orleans area. Areas close to where Ida made landfall such as LaFourche Parish, where Port Fourchon is located, was particularly hard hit with widespread destruction. Grand Isle Parish, a barrier island, has been declared uninhabitable. Even in towns just inland from where Ida came ashore, such as Galliano and Houma, wind damage was severe to catastrophic. 

In terms of storm surge, most levees held up well, with a few localized failures that have created flooding beyond that from storm surge. Communities to the north, west, south, and east of the hurricane protection system that surrounds New Orleans were inundated. Ida’s storm surge inundated far into the bayous and inhabited areas of southeastern Louisiana, as well as areas near Lake Pontchartrain. Minor near-coastal inundation also occurred in Mississippi and Alabama. Key areas flooded by storm surge in Louisiana include Port Fourchon, Grand Isle, Delacroix, Alliance, Lafitte, Jean Lafitte, Barataria, Laplace, Mandeville, Braithwaite, Shell Beach, Galliano, Golden Meadow, and Venetian Isles. Surge inundation depth exceeded 10 feet in some places, but several tide gauges near maximum storm surge broke, leading to uncertainty in Ida’s maximum storm surge water level. 

Louisiana has a statewide adoption of the Louisiana State Uniform Construction Code. These codes were adopted and have been effective since early 2018. According to these standards, buildings are required to be designed to a prescribed wind speed that varies spatially with higher design wind speeds along the coast and the values decreasing as we move inland. For Port Fourchon and Grand Isle, the design 3-second gust wind speeds for typical residential and commercial structures is between 160 and 170 mph. For towns such as Golden Meadow, Galliano, Dulac, and the southern portions of Houma, design requirements are between 150 and 160 mph on 3-second gust basis. New Orleans, Lockport, and towns along Route 90 require buildings to be designed to winds of 140 to 150 mph 3-second gust. 

Commercial buildings with higher human occupancy requirements and those serving essential functions such as hospitals are typically subject to more stringent requirements per the IBC, given the risk category in which individual commercial buildings fall. Generally, Hurricane Ida was below the design standards for structures built under these standards. Widespread catastrophic structural failure was therefore not expected. Buildings that are older and predate the adoption of some of these standards can be expected to perform worse and sometimes become debris sources that can impact adjacent newer buildings. While adoption of building codes is one aspect, an equally important aspect is their enforcement. While enforcement is good for coastal counties, the same is not true for inland counties. Therefore, as Ida trekked through the state and continued to produce damaging winds, damage can be expected to buildings across the entire state. 

According to AIR and Xactware®, a sister company within Verisk, materials costs have gone up significantly in the past year from supply chain disruption in the construction market. Although these costs have moderated since their peak in July when they were 80% higher than September of last year, they remain about 30% higher. Repair costs are still up significantly.  

Reconstruction costs are more expensive today than they were a year ago. The increase in the total reconstruction cost index means that costs are higher on average nationally; this affects the low- as well as the high-severity events. The difference in magnitude of the impact will come from the mix of construction materials used. For example, minor wind losses are less likely to require repairs that use more expensive inputs such as structural lumber; however, dwellings that are a total loss would require a broader mix of inputs that reflect the higher increases indicated by the total reconstruction index. Therefore, companies should bear these increases in mind and should expect the average claim to be higher before considering demand surge. 

An additional source of uncertainty related to materials cost demand surge is the cost of diesel fuel, which has been impacted by the shutdown of refineries during Ida; this fuel would be used to transport materials. While some of these facilities were undamaged, the uncertainty around the timing of the restoration of the power grid and lack of electricity in the meantime is going to keep some of them from coming back online and contributing to the diesel fuel supply. 

One other important aspect of demand surge to note is that after Hurricane Katrina, about half of the population of New Orleans moved away and the city never returned to pre Katrina population levels. This mass migration probably mitigated economic demand surge, which was not as great as it might have been after that storm. 

About AIR Worldwide
AIR Worldwide (AIR) provides risk modeling solutions that make individuals, businesses, and society more resilient to extreme events. In 1987, AIR Worldwide founded the catastrophe modeling industry and today models the risk from natural catastrophes, terrorism, pandemics, casualty catastrophes, and cyber incidents. Insurance, reinsurance, financial, corporate, and government clients rely on AIR’s advanced science, software, and consulting services for catastrophe risk management, insurance-linked securities, longevity modeling, site-specific engineering analyses, and agricultural risk management. AIR Worldwide, a Verisk (Nasdaq:VRSK) business, is headquartered in Boston, with additional offices in North America, Europe, and Asia. For more information, please visit www.air-worldwide.com.

To view this piece of content from www.globenewswire.com, please give your consent at the top of this page.
To view this piece of content from ml.globenewswire.com, please give your consent at the top of this page.

About GlobeNewswire by notified

GlobeNewswire by notified
GlobeNewswire by notified
One Liberty Plaza - 165 Broadway
NY 10006 New York

https://notified.com

GlobeNewswire by notified is one of the world's largest newswire distribution networks, specializing in the delivery of corporate press releases financial disclosures and multimedia content to the media, investment community, individual investors and the general public.

Subscribe to releases from GlobeNewswire by notified

Subscribe to all the latest releases from GlobeNewswire by notified by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from GlobeNewswire by notified

EPH European Property Holdings PLC announces 2023 Year-End Result26.4.2024 23:55:00 CEST | Press release

26 April 2024, Limassol, Cyprus / Ad hoc announcement pursuant to Art. 53 LR BUSINESS HIGHLIGHTS 2023 Despite the challenging market environment, EPH European Property Holdings PLC (“EPH” or the “Company”) maintained operational stability in 2023. This success can be attributed to its established portfolio of high-quality properties in prime locations in Europe, and professional asset management. As a result, EPH once again achieved almost full occupancy throughout its European portfolio, and exceeded own expectations by increasing net rental income by 26 percent compared to the previous year.As of 31 December 2023, EPH’s real estate portfolio consisted of eight core assets (and one parking garage) in outstanding locations in Germany and Vienna, all of which meet high sustainability standards. Seven out of eight office and hotel buildings have already been awarded certificates in DGNB Platinum, DGNB Gold, or LEED Gold.A milestone in the operating business was the completion of the LASS

FRO – Filing of Annual Report26.4.2024 22:36:43 CEST | Press release

Frontline plc (the “Company”) announces the filing of its annual report for the year ended December 31, 2023. The annual report can be downloaded from the Company’s website www.frontlineplc.cy or from the link below. Additionally, shareholders can request a hard copy of our complete audited financial statements free of charge by writing to us at: John Kennedy 8 Iris Building, 7th floor, Flat/Office 740B, 3106, Limassol, Cyprus. or sending an e-mail to ir@frontmgt.no April 26, 2024 Frontline plc Limassol, Cyprus. Questions should be directed to: Lars H. Barstad: Chief Executive Officer, Frontline Management AS +47 23 11 40 00 Inger M. Klemp: Chief Financial Officer, Frontline Management AS +47 23 11 40 00 This information is subject to the disclosure requirements pursuant to section 5 -12 of the Norwegian Securities Trading Act. Attachments 5493004BCIKYU1YL3H63-2023-12-31-enAnnual Report 2023

Kallelse till årsstämma 2024 i Fingerprint Cards AB (publ)26.4.2024 22:16:32 CEST | Pressemelding

Aktieägarna i Fingerprint Cards AB (publ), org. nr. 556154-2381 (”Bolaget” eller ”Fingerprint”), kallas härmed till årsstämma klockan 15.00 tisdagen den 28 maj 2024 på GT30 (mötesrum ”Bond”), Grev Turegatan 30 i Stockholm. Styrelsen har, i enlighet med Bolagets bolagsordning, beslutat att aktieägarna före årsstämman ska ha möjlighet att utöva sin rösträtt genom poströstning. Aktieägare kan därmed välja att utöva sin rösträtt vid stämman personligen, genom ombud eller genom poströstning. A. Rätt att delta på stämman Aktieägare som önskar delta vid årsstämman ska: vara införd i den av Euroclear Sweden AB förda aktieboken måndagen den 20 maj 2024, och anmäla sin avsikt att delta vid stämman till Bolaget i enlighet med anvisningarna under avsnitt ”B. Anmälan för deltagande personligen eller genom ombud” senast onsdagen den 22 maj 2024, eller avge en poströst i enlighet med anvisningarna under rubriken ”C.Anvisningar för poströstning” senast onsdagen den 22 maj 2024. För att ha rätt att del

Notice to attend the 2024 Annual General Meeting of Fingerprint Cards AB (publ)26.4.2024 22:16:32 CEST | Press release

The shareholders of Fingerprint Cards AB (publ), Corp. Reg. No. 556154-2381 (hereinafter referred to as the “Company” or “Fingerprint”)), are hereby invited to attend the Annual General Meeting (“AGM” or the “Meeting”) to be held at 3:00 p.m. on Tuesday, May 28, 2024, at GT30 (meeting room “Bond”), Grev Turegatan 30 in Stockholm. The Board of Directors has decided, pursuant to the Company’s articles of association, that shareholders shall also have the right to exercise their voting rights by postal voting. Shareholders may therefore choose to exercise their voting rights at the Meeting by attending in person, through a proxy or by postal voting. A. Right to participate in the Meeting In order to participate in the Meeting, a shareholder shall: be registered in the register of shareholders maintained by Euroclear Sweden AB as of Monday, May 20, 2024, and give notice of attendance at the Meeting to the Company in accordance with the instructions set out in the section “B. Notice of atte

Fingerprints announces partially guaranteed rights issue of up to approximately SEK 310 million, agreement on early redemption of its convertible bonds, bridge loan of SEK 60 million and preliminary financial information for Q1 202426.4.2024 22:00:00 CEST | Press release

NOT FOR RELEASE, DISTRIBUTION OR PUBLICATION, DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES OF AMERICA, AUSTRALIA, BELARUS, HONG KONG, JAPAN, CANADA, NEW ZEALAND, RUSSIA, SINGAPORE, SOUTH AFRICA OR ANY OTHER JURISDICTION IN WHICH THE RELEASE, DISTRIBUTION OR PUBLICATION WOULD BE UNLAWFUL. PLEASE SEE "IMPORTANT INFORMATION" AT THE END OF THIS PRESS RELEASE. The Board of Directors of Fingerprint Cards AB ("Fingerprints" or the "Company") has resolved on a partially guaranteed issue of new shares of series B (“B-shares”) of up to approximately SEK 310 million with preferential rights for its existing shareholders, subject to subsequent approval from the annual general meeting in the Company to be held on 28 May 2024 (the “Rights Issue”). The Rights Issue is subject to subscription undertakings and guarantee commitments in a total amount of up to SEK 275 million. The Board of Directors of Fingerprints has also entered into an agreement with an entity managed by

HiddenA line styled icon from Orion Icon Library.Eye