GlobeNewswire by notified

Surge Copper Intersects 296 metres of 0.53% CuEq including 66 metres of 0.75% CuEq in Infill and Step Out Drilling at the Ootsa Property

Share

VANCOUVER, British Columbia, Nov. 04, 2021 (GLOBE NEWSWIRE) -- Surge Copper Corp. (TSXV: SURG) (OTCQX: SRGXF) (Frankfurt: G6D2) (“Surge” or the “Company”) is pleased to announce assay results for multiple resource definition holes from the Company’s 100% owned Ootsa Property in British Columbia.

Highlights

  • Hole S21-264 was targeting extensions of mineralization into the Gap Zone connecting West and East Seel. This 60-degree angled hole intersected 296 metres grading 0.53% copper equivalent from a downhole depth of 448 metres including 66 metres grading 0.75% copper equivalent
  • Hole S21-267 was targeting the northern limits of the East Seel deposit and intersected 305 metres grading 0.46% copper equivalent from a downhole depth of 52 metres, and included 20 metres grading 1.04% copper equivalent
  • Drilling at the Far East Target, located 300 metres northeast of the East Seel deposit, has expanded a modest zone of near surface mineralization that remains open to the east

Assay results have been received for holes S21-262, 264, 267, and 269, with significant assay results summarized in the table below. Holes S21-262 and 264 tested the southwestern margin of the East Seel deposit and the area between the East and West Seel deposits known as the Gap Zone, and have defined a large mineralized zone at depth in that area. Hole S21-267 tested the northeast edge of the East Seel deposit and hole S21-269 expanded a modest zone of near surface mineralization 300 metres northeast of East Seel at the Far East Target.

East Seel and Gap Zone Drilling

Hole S21-267 tested the northeast margin of the East Seel deposit and ended within known East Seel mineralization. The hole successfully expanded near surface mineralization on the northeast margin of East Seel, returning 0.46% copper equivalent over 305 metres including 0.57% copper equivalent over 106 metres and 1.04% copper equivalent over 20 metres.

Holes S21-262 and 264 were collared on the west side of the East Seel deposit and drilled toward the southwest testing the Gap Zone. Both holes help to expand and define a zone of near surface low grade mineralization at the Gap Zone, and a larger zone of deeper mineralization that remains open at depth.

Far East Target Drilling

Hole S21-269 was a 100 metre step out to the northeast of the Far East Target and expanded a modest zone of near surface mineralization located 100 to 300 metres northeast of the East Seel deposit. Hole S21-269 successfully expanded the Far East Target 100 metres to the northeast returning 90 metres grading 0.28% copper equivalent starting below gravel cover at 34 metres depth.

A Media Snippet accompanying this announcement is available by clicking on the image or link below:

To view this piece of content from ml.globenewswire.com, please give your consent at the top of this page.

Plan map of drill hole locations for 2021 Ootsa summer and fall drill program.

Summary of Assay Results for Selected Holes
Drill HoleFrom (m)To (m)Width (m)1CuEq (%)2Cu (%)Au (g/t)Mo (%)Ag (g/t)
S21-2624064240.300.140.080.0260.9
S21-26274118440.240.120.050.0181.1
S21-262392406140.330.150.140.0121.0
S21-262700830 EOH1300.490.260.190.0122.2
including718770520.840.360.380.0372.7
S21-26474104300.200.110.090.0030.7
S21-264136164280.230.130.080.0051.0
S21-264210296860.210.080.040.0270.7
S21-264386408220.370.150.180.0140.9
S21-264448744 EOH2960.530.230.240.0201.7
including492558660.750.300.400.0231.7
S21-26752357 EOH3050.460.210.260.0011.2
including1242301060.570.260.340.0011.1
including286306201.040.500.590.0002.8
S21-26934124900.280.160.100.0051.2
including4866180.380.230.140.0041.0
1.   Width refers to drill hole intercepts; true widths have not been determined. EOH = end of hole.
2.   CuEq (copper equivalent) has been used to express the combined value of copper, gold, molybdenum, and silver as a percentage of copper, and is provided for illustrative purposes only. No allowances have been made for recovery losses that may occur should mining eventually result. Calculations use metal prices of US$3.00/lb copper, US$1,800/oz gold, US$10/lb molybdenum, and US$22/oz silver, using the formula CuEq % = Cu % + (Au g/t x 0.875) + (Mo % x 3.33) + (Ag g/t x 0.0107).

A Media Snippet accompanying this announcement is available by clicking on the image or link below:

To view this piece of content from ml.globenewswire.com, please give your consent at the top of this page.

East Seel and Gap Zone section E-E’ showing results for holes S21-262, 264, and 267. See Figure 1 for section location.

Ootsa 2021 Drilling Summary

The summer 2021 core drilling program at Ootsa comprised a total of 26,556 metres of drilling in 72 holes. Thus far, following this news release, results from 24 holes have been released, with results from 48 additional holes pending. Results from 45 holes focused on the shallow Breccia Zone located to the north of the Seel deposits are pending, as are holes from select regional exploration targets, and the bottom portion of hole S21-268, which is the last remaining hole to be reported from West Seel drilling.

Berg Exploration Program Update

The 2021 core drilling program at the Berg deposit area has been completed for the season and will resume next summer. Nine core holes were completed at Berg for a total of 2,855 metres of drilling. All of the Berg drill core has been logged and sampled and submitted to the lab for assay.

Upcoming Catalysts

The Company anticipates updating the market on results from the following activities:

  • Drill results from 48 remaining drill holes from 2021 Ootsa drill program
  • Drill results from 9 drill holes from 2021 Berg drill program
  • Resource update for the Ootsa project
  • Inversion and targeting results from regional airborne geophysics, and update on regional exploration pipeline

The Company is well financed with over C$10 million in the treasury.

Quality Control

All drill core is logged, photographed, and cut in half with a diamond saw. Half of the core is bagged and sent to ALS Geochemistry in Kamloops, British Columbia for analysis (which is ISO/IEC 17025 accredited), while the other half is archived and stored on site for verification and reference purposes. Gold is assayed using a 30g fire assay method and 33 additional elements are analyzed by Induced Coupled Plasma (ICP) utilizing a 4-acid digestion. Duplicate samples, blanks, and certified standards are included with every sample batch and then checked to ensure proper quality assurance and quality control.

Qualified Person

Dr. Shane Ebert P.Geo., is the Qualified Person for the Ootsa and Berg projects as defined by National Instrument 43-101 and has approved the technical disclosure contained in this news release.

About Surge Copper Corp.

The Company owns a 100% interest in the Ootsa Property, an advanced stage exploration project containing the East Seel, West Seel and Ox porphyry deposits located adjacent to the open pit Huckleberry Copper Mine, owned by Imperial Metals. The Ootsa Property contains pit constrained NI 43-101 compliant resources of copper, gold, molybdenum, and silver in the Measured and Indicated categories.

The Company is also earning into a 70% interest in the Berg Property from Centerra Gold. Berg is a large, advanced stage exploration project located 28 km northwest of the Ootsa deposits. Berg contains pit constrained 43-101 compliant resources of copper, molybdenum, and silver in the Measured and Indicated categories. Combined, the adjacent Ootsa and Berg properties give Surge a dominant land position in the Ootsa-Huckleberry-Berg district and control over four advanced porphyry deposits.

On Behalf of the Board of Directors

“Leif Nilsson”
Chief Executive Officer

For Further information, please contact:
Riley Trimble, Corporate Communications & Development
Telephone: +1 604 416 2978
Email: info@surgecopper.com
Twitter: @SurgeCopper
LinkedIn: Surge Copper Corp
https://www.surgecopper.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This News Release contains forward-looking statements, which relate to future events. In some cases, you can identify forward-looking statements by terminology such as "will", "may", "should", "expects", "plans", or "anticipates" or the negative of these terms or other comparable terminology. All statements included herein, other than statements of historical fact, are forward looking statements, including but not limited to the Company’s plans regarding the Berg Property and the Ootsa Property. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity, performance, or achievements to be materially different from any future results, levels of activity, performance, or achievements expressed or implied by these forward-looking-statements. Such uncertainties and risks may include, among others, actual results of the Company's exploration activities being different than those expected by management, delays in obtaining or failure to obtain required government or other regulatory approvals, the ability to obtain adequate financing to conduct its planned exploration programs, inability to procure labour, equipment and supplies in sufficient quantities and on a timely basis, equipment breakdown, impacts of the current coronavirus pandemic, and bad weather.While these forward-looking statements, and any assumptions upon which they are based, are made in good faith, and reflect the Company's current judgment regarding the direction of its business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions, or other future performance suggestions herein. Except as required by applicable law, the Company does not intend to update any forward-looking statements to conform these statements to actual results.

To view this piece of content from www.globenewswire.com, please give your consent at the top of this page.
To view this piece of content from ml.globenewswire.com, please give your consent at the top of this page.

About GlobeNewswire by notified

GlobeNewswire by notified
GlobeNewswire by notified
One Liberty Plaza - 165 Broadway
NY 10006 New York

https://notified.com

GlobeNewswire by notified is one of the world's largest newswire distribution networks, specializing in the delivery of corporate press releases financial disclosures and multimedia content to the media, investment community, individual investors and the general public.

Subscribe to releases from GlobeNewswire by notified

Subscribe to all the latest releases from GlobeNewswire by notified by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from GlobeNewswire by notified

Galapagos increases share capital through subscription right exercises3.12.2021 22:01:00 CET | Press release

Mechelen, Belgium; 3 December 2021, 22.01 CET; regulated information – Galapagos NV (Euronext & NASDAQ: GLPG) announces a share capital increase arising from subscription right exercises. Galapagos issued 22,600 new ordinary shares on 3 December 2021, for a total capital increase (including issuance premium) of €578,700.00. Pursuant to the subscription right exercise program of Galapagos’ management board, members of the management board automatically are committed to exercise a minimum number of subscription rights, subject to certain conditions. In accordance with the rules of this program, one management board member exercised 5,000 subscription rights. In accordance with Belgian transparency legislation1, Galapagos notes that its total share capital currently amounts to €354,582,005.11, the total number of securities conferring voting rights amounts to 65,552,721, which is also the total number of voting rights (the “denominator”), and all securities conferring voting rights and al

Sampo plc’s share buybacks 03/12/20213.12.2021 21:30:00 CET | Press release

SAMPO PLC STOCK EXCHANGE RELEASE 03/12/2021 at 10:30 pm Sampo plc’s share buybacks 03/12/2021 On 03/12/2021 Sampo plc (business code 0142213-3, LEI 743700UF3RL386WIDA22) has acquired its own A shares (ISIN code FI0009003305) as follows: Sampo plc’s share buybacksAggregated daily volume (in number of shares)Daily weighted average price of the purchased shares*Market (MIC Code)23,68743.29AQEU27,42643.28CEUX4,32043.37TQEX72,59243.31XHELTOTAL128,02543.30 *rounded to two decimals On 1 October 2021, Sampo announced a share buyback programme of up to a maximum of EUR 750 million in compliance with the Market Abuse Regulation (EU) 596/2014 (MAR) and the Commission Delegated Regulation (EU) 2016/1052. The programme, which started on 4 October 2021, is based on the authorization granted by Sampo's Annual General Meeting on 19 May 2021. After the disclosed transactions, the company owns in total 6,263,553 Sampo A shares representing 1.13 per cent of the total number of shares in Sampo plc. Detail

Projekt Öyfjellet försenat – beräknas färdigställas under första kvartalet 20223.12.2021 21:15:00 CET | Pressemelding

Hässleholm den 3 december 2021 I delårsrapporten för det tredje kvartalet, som offentliggjordes den 18 november 2021, kommunicerade Eolus att det finns risk för försening i färdigställandet av det norska 400 MW projektet Öyfjellet. Baserat på uppdaterad information om byggprocessen beräknar Eolus nu att vindparken färdigställs under det första kvartalet 2022. Per idag, den 3 december 2021, har samtliga 72 turbiner färdigmonterats. 34 turbiner har börjat generera el. Huvudskälen till förseningen är utmanande väderförhållanden, vilket har påverkat installationsarbetet, samt Covid-19 relaterade orsaker som begränsat både resemöjligheterna för personal och lett till leveransförseningar avseende komponenter. Förseningen kommer att ha en negativ påverkan på Eolus projektmarginal. För ytterligare information kontakta: Per Witalisson, VD, telefon +46 (0)70-265 16 15 Johan Hammarqvist, kommunikationschef, telefon +46 (0)720-50 59 11 Kort om Eolus Eolus Vind är en av Nordens ledande projektörer

Project Øyfjellet delayed - new estimated completion in the first quarter of 20223.12.2021 21:15:00 CET | Press release

Hässleholm, Sweden, December 3rd, 2021 In the interim report for the third quarter, released on November 18, 2021, Eolus communicated a risk of delay in the completion of the 400 MW Norwegian wind project Øyfjellet. Based on updated information of the construction progress, Eolus now estimates that the wind farm will be completed during the first quarter of 2022. As of today, December 3, 2021, construction of all 72 turbines have been completed. First electricity production has been achieved by 34 turbines. The main reasons for the delay are challenging weather conditions which has effected the progress of the installations and Covid-19 related issues which has restricted both travel possibilities for personnel and led to delays in delivery of components. The delay is expected to have a negative impact on Eolus’ profit margin for the construction of the project. For further information contact: Per Witalisson, CEO, +46 70-265 16 15 Johan Hammarqvist, Head of Communications, +46 720 50

ING reports outcome of 2021 EU-wide Transparency Exercise and Risk Assessment Report3.12.2021 18:12:26 CET | Press release

ING reports outcome of 2021 EU-wide Transparency Exercise and Risk Assessment Report ING notes the announcements made today by the European Banking Authority (EBA) and the European Central Bank (ECB) regarding the information of the 2021 EU-wide Transparency Exercise and Risk Assessment Report. Background EU‐wide Transparency Exercise The EBA Board of Supervisors approved the package for the EU‐wide Transparency Exercise, which since 2016 is performed on an annual basis and published along with the Risk Assessment Report (RAR). The annual transparency exercise is based solely on regulatory reporting data (COREP/FINREP) on the form and scope to assure a sufficient and appropriate level of information to market participants. The templates were centrally filled in by the EBA and sent afterwards for verification by banks and supervisors. The outcome of the exercise related to ING Group can be found in the annexes on the EBA website. Note for editors For further information on ING, please v

KBC Group: KBC report on the 2021 EBA Transparency Exercise3.12.2021 18:10:00 CET | Press release

Press Release Outside trading hours - Regulated information* Brussels, 3 December 2021 – after trading hours KBC report on the 2021 EBA Transparency Exercise KBC notes the announcements made today by the European Banking Authority (EBA) and the European Central Bank (ECB) regarding the publication of the EU-wide Transparency Exercise. The information of this 2021 EU-wide Transparency Exercise refers to the reported data as of 30 September 2020, 31 December 2020, 31 March 2021 and 30 June 2021. The templates, published on a bank-by-bank basis, are the following: Key MetricsLeverage ratioCapitalRisk exposure amountsP&LTotal Assets: fair value and impairment distributionLiabilitiesMarket RiskCredit RiskGeneral governments exposuresPerforming and Non-Performing ExposuresForborne ExposuresLoans and advances to non-financial corporationsCovid-19 The data collection relies on the standard information reported by the banks to the EBA on a regular basis through the supervisory reporting framewo

Changes in the Board of Directors3.12.2021 17:40:00 CET | Press release

Basel, 3 December 2021 - Roche (SIX: RO, ROG; OTCQX: RHHBY) today announced that at its December meeting the Board of Directors of Roche Holding Ltd has approved first proposals to the Annual General Meeting (AGM) scheduled for 15 March 2022. Mr Paul Bulcke, who has been serving on the Board of Directors since 2011, has decided not to stand for re-election at the AGM in 2022, following almost eleven years of tenure. The Board of Directors proposes Dr Jemilah Mahmood, currently the Special Advisor on Public Health to Malaysia’s prime minister, for election to the Board of Directors at the AGM 2022. “As a member of the Board and of the Audit Committee, Paul Bulcke has made significant contributions to Roche’s success,” said Roche Chairman Christoph Franz. “On behalf of the Board of Directors, I would like to extend our sincere thanks to Paul Bulcke who gave great support to Roche with his enormous leadership experience and his strong entrepreneurial thinking.” Christoph Franz added: “I a