GlobeNewswire

Nokia signs 5G deal to become BT’s largest infrastructure partner

Share

Press Release

Nokia signs 5G deal to become BT’s largest infrastructure partner

  • Nokia increases market share of BT’s Radio Access Network after selection as 5G RAN supplier

29 September 2020

Espoo, Finland – Nokia today announced that it has extended its long-term strategic relationship with BT into the 5G arena, following its selection as a 5G RAN vendor for the UK operator. As part of the deal, which will make Nokia BT’s largest equipment provider, Nokia will provide equipment and services at BT radio sites across the UK, helping to evolve BT’s radio access network to 5G and supporting its goal of maintaining the UK’s best network.

BT’s Nokia-powered network, which currently includes Greater London, the Midlands and rural locations, will be extended to also cover multiple other towns and cities across the United Kingdom1. This enhanced Nokia footprint will support BT’s commitments to the UK government around the use of High Risk Vendors (HRVs) in UK network infrastructure.   

Nokia will supply its AirScale Single RAN (S-RAN) portfolio for both indoor and outdoor coverage, including 5G RAN, AirScale base stations and Nokia AirScale radio access products. These solutions will enable BT to build on its existing network leadership in the UK  to deliver connectivity and capacity benefits to consumers at ultra-low latencies as well as reducing complexity and increasing cost efficiencies. The deal will also see Nokia optimize BT’s 2G and 4G networks and work alongside BT on the development of the OpenRAN ecosystem.

As part of BT’s network transformation, the operator will also utilize Nokia Software’s ng-SDM and NetAct network management platform, supporting the network evolution to 5G. These build upon the existing network architecture and provide an immediate cornerstone and single platform for new 5G-based services. Nokia will also provide its state-of-the-art Cell Site Gateway product providing key backhaul connectivity. 

Nokia will also provide digital design and deployment for a faster time to market as well as optimization and technical support services.

Philip Jansen, CEO, BT Group said: “Digital connectivity is critical to the UK’s economic future, creating jobs and underpinning sustainable growth. That’s why BT is making game-changing investments in full fibre and 5G. In a fast-moving and competitive market, it’s critical we make the right technology choices. With this next stage of our successful relationship with Nokia we will continue to lead the rollout of fixed and mobile networks to deliver stand-out experiences for customers.”

Pekka Lundmark, President and CEO, Nokia, said: “I am delighted that BT has extended its partnership with Nokia on 5G RAN, making Nokia BT’s largest infrastructure partner. Our two companies have collaborated for over a quarter of a century in order to deliver best-in-class connectivity to people across the United Kingdom. We are proud to support BT’s 5G network evolution and look forward to working even more closely together in the years to come.”

Notes to Editors

1.)     Aberdeen, Bournemouth, Brighton, Cambridge, Carlisle, Cheltenham-Gloucester, Chesterfield, Dundee, Exeter, Grimsby, Hull, Ipswich, Lincoln, Newbury, Northampton, Norwich, Peterborough, Plymouth, Southampton, Stoke-on-Trent, Swindon, Torbay, York

Resources:

Webpage : Nokia AirScale

Webpage : Nokia 5G RAN

Webpage: Nokia NetAct

Webpage: Nokia Single RAN

About Nokia
We create the technology to connect the world. Only Nokia offers a comprehensive portfolio of network equipment, software, services and licensing opportunities across the globe. With our commitment to innovation, driven by the award-winning Nokia Bell Labs, we are a leader in the development and deployment of 5G networks.

Our communications service provider customers support more than 6.4 billion subscriptions with our radio networks, and our enterprise customers have deployed over 1,300 industrial networks worldwide. Adhering to the highest ethical standards, we transform how people live, work and communicate. For our latest updates, please visit us online www.nokia.com and follow us on Twitter @nokia.

Media Inquiries:
Nokia
Communications
Phone: +358 10 448 4900
Email: press.services@nokia.com

To view this piece of content from www.globenewswire.com, please give your consent at the top of this page.

About GlobeNewswire

GlobeNewswire
GlobeNewswire
One Liberty Plaza - 165 Broadway
NY 10006 New York

https://globenewswire.com

GlobeNewswire is one of the world's largest newswire distribution networks, specializing in the delivery of corporate press releases financial disclosures and multimedia content to the media, investment community, individual investors and the general public.

Subscribe to releases from GlobeNewswire

Subscribe to all the latest releases from GlobeNewswire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from GlobeNewswire

New Zolgensma data demonstrate age-appropriate development when used presymptomatically and rapid, clinically meaningful efficacy in symptomatic children, even those with severe SMA at baseline18.6.2021 18:30:00 CEST | Press release

All children (100%) treated presymptomatically in the SPR1NT two-copy cohort survived without respiratory or nutritional support, and sat independently for ≥30 seconds, most (11/14) within the WHO window of expected normal development The majority of children (82%) treated in STR1VE-EU achieved developmental motor milestones not observed in the natural history of SMA Type 1, including patients with more severe disease More than 1,200 patients have now been treated with Zolgensma globally across clinical trials, managed access programs, and in the commercial setting1 Basel, June 18, 2021– Novartis today announced data that reinforce the transformational benefit of Zolgensma® (onasemnogene abeparvovec), an essential, one-time treatment and the only gene therapy for spinal muscular atrophy (SMA). New late-breaker data from the completed two-copy cohort of the Phase 3 SPR1NT clinical trial demonstrate age-appropriate milestone development in presymptomatic children with SMA without respira

The results of the private placement of Subordinated Convertible Notes and private placement of Secured Notes of AS PRFoods / transactions with persons connected with the issuer18.6.2021 16:22:48 CEST | Press release

THIS NOTICE IS NOT INTENDED FOR PUBLICATION, ALLOCATION OR TRANSMISSION, IN PART OR WHOLLY, DIRECTLY OR INDIRECTLY, IN THE UNITED STATES, AUSTRALIA, CANADA, HONG KONG, JAPAN, NEW ZEALAND, SINGAPORE, SOUTH AFRICA, OR ELSEWHERE THE DISCLOSURE OR TRANSMISSION OF THIS INFORMATION IS NOT ALLOWED. By a company announcement dated 04.06.2021, AS PRFoods (hereinafter "PRFoods") informed investors that it was conducting an issue of subordinated convertible notes, whereunder PRFoods is to issue up to 350 subordinated convertible notes, with the maximum aggregate nominal value of up to EUR 3,500,000, nominal value of EUR 10,000 per subordinated convertible note, interest rate of 7% per annum and maturity date on 01.10.2025 (hereinafter the “ConvertibleNotes”). The subscription period for the Convertible Notes ended on 14.06.2021. In course of the private placement, investors subscribed for 237 Convertible Notes, with the aggregate nominal value of EUR 2,370,000, i.e. for approximately 67% of the m

CONDITIONS FOR PURCHASES OF CORPORATE BONDS18.6.2021 16:20:00 CEST | Press release

Bid procedure, 2021-06-23BondsBonds issued in SEK by Swedish non-financial undertakings. The following bonds are eligible for delivery: RIKSHEM AB: SE0011452507, 2023-07-18 RIKSHEM AB: SE0011869981, 2023-05-08 EPIROC AB: XS1918042364, 2023-12-06 EPIROC AB: XS2258568778, 2026-05-18 SCANIA CV AB: XS2042641121, 2022-08-22 SCANIA CV AB: XS2332891089, 2023-04-19 AB INDUSTRIVARDEN: SE0011869668, 2022-02-28 AB INDUSTRIVARDEN: SE0012676724, 2023-02-20 SVENSK FASTIGHETS FIN: SE0012194058, 2022-02-28 SVENSK FASTIGHETS FIN: SE0012676872, 2022-09-07 Delivery of a Bond may not occur if the Counterparty has purchased the Bond from the issuer more recently than one month prior to the date of announcement of the Special terms, that is, the purchase may not have taken place after: 2021-05-23Bid date2021-06-23Bid times10.00-11.00 (CET/CEST) on the Bid dateRequested volume (corresponding nominal amount)SE0011452507: 30 mln SEK +/-30 mln SEK SE0011869981: 30 mln SEK +/-30 mln SEK XS1918042364: 30 mln SEK

CONDITIONS FOR RIKSBANK BID PROCEDURE KOMMUNINVEST BONDS18.6.2021 16:20:00 CEST | Press release

Bid procedure, 2021-06-22BondsKOMMUNINVEST I SVERIGE: 2311. SE0010948240. 2023-11-13 KOMMUNINVEST I SVERIGE: 2505, SE0011414010, 2025-05-12 KOMMUNINVEST I SVERIGE: 2805, SE0015660139, 2028-05-12 BidsBids on interest and volume are entered via Bloomberg Bond Auction SystemBid date2021-06-22Bid times10.00-11.00 (CET/CEST) on the Bid dateRequested volume (corresponding nominal amount)2311: 500 mln SEK +/-250 mln SEK 2505: 1000 mln SEK +/-500 mln SEK 2805: 750 mln SEK +/-350 mln SEK Highest permitted bid volume (corresponding nominal amount)2311: 500 mln SEK per bid 2505: 1000 mln SEK per bid 2805: 750 mln SEK per bid Lowest permitted bid volume (corresponding nominal amount)SEK 50 million per bidExpected allocation timeNot later than 11.15 (CET/CEST) on the Bid dateDelivery and payment date2021-06-24Delivery of bondsTo the Riksbank's account in Euroclear Sweden AB's securities settlement system 1 4948 6383General Terms and ConditionsGeneral Terms and Conditions General Terms and Condition

CONDITIONS FOR THE RIKSBANK´S PURCHASES OF COMMERCIAL PAPER18.6.2021 16:20:00 CEST | Press release

Bid procedure, 2021-06-23CertificateCommercial paper issued in SEK by non-financial companies with their registered office in Sweden and with a remaining maturity of up to six months on the Bid date. i.e. with the latest maturity date as of 2021-12-23 Delivery may not be made in commercial paper purchased by the Counterparty from the issuer less than one week prior to the date for announcing the Special terms, i.e. the purchase may not have been made after 2021-06-11 BidsCounterparties may make one bid per Credit rating class and maturity class. Bids are made to tel 08-696 69 70 and confirmed by e-mail to EOL@riksbank.se.Bid date2021-06-23Bid times09.00-09.30 (CET/CEST) on the Bid dateRequested volume (corresponding nominal amount)SEK 4 billionHighest permitted bid volume (corresponding nominal amount)The total bid volume from one Counterparty for the two Credit rating classes may not exceed SEK 4 billion. No bid may contain Commercial paper in excess of SEK 250 million issued by the s

Eolus förvärvar två fullt tillståndsgivna svenska vindkraftsprojekt18.6.2021 16:15:00 CEST | Pressemelding

Hässleholm den 18 juni 2021 Eolus har tecknat avtal med RWE om att förvärva två fullt tillståndsgivna svenska vindkraftsprojekt. Projekten som omfattar 99 MW är lokaliserade i SE3 och Eolus kommer under sommaren att påbörja försäljningsprocessen med ambitionen att teckna avtal med en investerare under hösten 2021. Projekten är belägna i Avesta kommun (Skallberget/Utterberget) och Hedemora kommun (Tjärnäs) och omfattar totalt vardera 74,4 MW och 24,8 MW. Projekten är fullt tillståndsgivna. Eolus kommer under sommaren att påbörja försäljningsprocessen med ambitionen att teckna ett avtal med en investerare under hösten 2021. Planerad driftsättning är under 2023. För ytterligare information kontakta: Per Witalisson, VD, telefon +46 (0)70-265 16 15 Johan Hammarqvist, kommunikationschef, telefon +46 (0)720-50 59 11 Kort om Eolus Eolus Vind är en av Nordens ledande projektörer av vindkraftsanläggningar. Eolus skapar värden i alla led inom ramen för projektutveckling och drift av vindkraftsanl

Eolus acquires two fully permitted wind power projects in Sweden18.6.2021 16:15:00 CEST | Press release

Hässleholm, Sweden, June 18, 2021 Eolus has signed an agreement to acquire two fully permitted wind power projects in Sweden from RWE. The projects located in SE3 totals about 99 MW and Eolus will during summer initiate the sales process with the ambition to sign an agreement with an investor during the autumn of 2021. The projects are located in Avesta municipality (Skallberget/Utterberget) and Hedemora municipality (Tjärnäs) and totals respectively 74.4 MW and 24.8 MW. The projects are fully permitted. Eolus will during the summer initiate the sales process with the ambition to sign an agreement with an investor during the autumn of 2021. Planned commissioning is during 2023. For further information contact: Per Witalisson, CEO, +46 70-265 16 15 Johan Hammarqvist, Head of Communications, +46 720 50 59 11 About Eolus: Eolus Vind AB is one of the leading wind power developers in the Nordics. Eolus is active in the whole value chain from development of green field projects to constructi