GlobeNewswire by notified

Fortuna reports results for the first quarter of 2023

Share

(All amounts are expressed in US dollars, tabular amounts in millions, unless otherwise stated)

VANCOUVER, British Columbia, May 15, 2023 (GLOBE NEWSWIRE) -- Fortuna Silver Mines Inc. (NYSE: FSM) (TSX: FVI) (“Fortuna” or the “Company”) today reported its financial and operating results for the first quarter of 2023.

First Quarter 2023 highlights

Financial

  • Adjusted net income of $13.2 million or $0.05 per share
  • Net income of $11.9 million or $0.04 per share
  • Adjusted EBITDA1 of $65.3 million
  • Net cash provided by operating activities $41.8 million and free cash flow from ongoing operations of $8.5 million
  • Liquidity as of March 31, 2023 was $129.7 million

Return to Shareholders

  • NCIB share repurchase program renewed for up to 5% of outstanding common shares (refer to Fortuna news release dated April 28, 2023)

Operational

  • Gold production of 60,092 ounces
  • Silver production of 1,586,378 ounces
  • Gold equivalent production of 94,110 ounces
  • Consolidated cash costs1 per ounce of gold equivalent sold of $916
  • Consolidated AISC1 per ounce of gold equivalent sold of $1,514
  • Lost Time Injury Frequency Rate (LTIFR) of 0.56 and Total Recordable Injury Frequency Rate (TRIFR) of 1.39

Growth and Development

  • On May 8, 2023 Fortuna announced a definitive agreement to acquire Chesser Resources Ltd. by way of an all share transaction for a total consideration of A$89.0 million (CAD$80.6). Upon completion, the former shareholders of Chesser will own approximately 5.1% of the shares of Fortuna on an undiluted basis. Chesser Resources’ Diamba Sud Project in Senegal expands Fortuna’s advanced exploration pipeline in West Africa.
  • First gold pour at the Séguéla mine in Cote d’Ivoire is planned for May 2023

Jorge A. Ganoza, President and CEO, commented, “Production and total cost per ounce for the first quarter were overall on plan, resulting in net earnings per share of $0.04 and free cash flow from operations of $8.5 million. Commissioning activities at Séguéla are well advanced and tracking according to plan for first gold pour in May, giving us a higher level of confidence in a smooth ramp-up process towards design capacity.” Mr. Ganoza continued, “The announced Chesser transaction meets our strategic objective of expanding our asset portfolio of high value opportunities in countries where we operate or near neighbours.” Mr. Ganoza concluded, “The Chesser acquisition provides for an exciting advanced exploration opportunity, expanding our West African presence to Senegal, a mining friendly jurisdiction, and into the heart of the Senegal-Mali shear zone, one of the most prolific gold belts in the West African region.”

First Quarter 2023 Consolidated Results

Three months ended March 31,
(Expressed in millions)20232022% Change
Sales 175.7182.3(4%)
Mine operating income 40.463.5(36%)
Operating (loss) income 23.940.7(41%)
Net (loss) income 11.927.0(56%)
(Loss) earnings per share - basic 0.040.09(56%)
Adjusted net income1 13.233.3(60%)
Adjusted EBITDA1 65.380.3(19%)
Net cash provided by operating activities 41.833.226%
Free cash flow from ongoing operations1 8.59.6(11%)
Production cash cost ($/oz Au Eq) 91677219%
All-in sustaining cash cost ($/oz Au Eq) 1,5141,28418%
Capital expenditures2
Sustaining 27.918.055%
Non-sustaining3 1.21.9(37%)
Séguéla construction 25.742.9(40%)
Brownfields 4.92.596%
As atMarch 31, 2023December 31, 2022% Change
Cash and cash equivalents 84.780.55%
Net liquidity position 129.7150.5(14%)

1 Refer to Non-IFRS Financial Measures section at the end of this news release and to the MD&A accompanying the Company’s financial statements filed on SEDAR at www.sedar.com for a description of the calculation of these measures.  
2 Capital expenditures are presented on a cash basis
3 Non-sustaining expenditures include greenfields exploration
Figures may not add due to rounding

First Quarter 2023 Results

Net income for the quarter was $11.9 million compared to $27.0 million in Q1 2022. After adjusting for non-cash and non-recurring items, adjusted net income of $13.2 million for Q1 2023 was $20.1 million lower than Q1 2022. The decrease in adjusted net income was primarily due to higher operating expenses related mainly to higher input costs across our operations and lower operating margins at Yaramoko and Lindero related to lower head grades. This impact was combined with slightly lower sales of $6.7 million, mostly explained by lower silver prices of $22.52 per ounce in Q1 2023 compared to $24.18 per ounce in Q1 2022. These effects were partially offset by lower general and administrative expenses of $2.0 million compared to Q1 2022.

Adjusted EBITDA for the quarter was $65.3 million, a 36% margin over sales, compared to $80.3 million reported in Q1 2022, representing a 44% margin over sales. The main driver for the decrease in EBITDA were higher operating costs and slightly lower sales as described above.

Net cash generated by operations for the quarter was $41.8 million or $0.14 per share compared to $33.2 million or $0.11 per share in Q1 2022. The increase reflects lower EBITDA of $15.0 million offset by negative changes in working capital in the current quarter of $10.8 million versus negative changes of $27.9 million in Q1 2022, and lower-income taxes paid of $7.1 million.

Free cash flow from ongoing operations for the quarter was $8.5 million, compared to $9.6 million in Q1 2022. The decrease is the result of higher net cash generated by operations of $8.6 million compared to the Q1 2022, offset by higher sustaining capex and brownfields exploration at our operating mines of $12.3 million in Q1 2023.

Liquidity

The Company’s total liquidity available as of March 31, 2023 was $129.7 million, comprised of $84.7 million in cash and cash equivalents, and $45.0 million undrawn on the $250.0 million revolving credit facility.

Séguéla Gold Project Construction Update

As of March 31, 2023, the Séguéla Gold Project had approximately $22.5 million in remaining spend of the project’s $173.5 million total initial capital, and the project remains on-time and on-budget. The Company’s cash and cash equivalents balance, free cash flow from ongoing operations and undrawn amounts of the revolving credit facility are expected to fund the remaining construction spend of the Séguéla Gold Project.

Lindero Mine, Argentina

Three months ended March 31,
20232022
Mine Production
Tonnes placed on the leach pad 1,478,1481,295,755
Gold
Grade (g/t) 0.710.88
Production (oz) 25,25830,068
Metal sold (oz) 26,81228,619
Realized price ($/oz) 1,8851,890
Unit Costs
Cash cost ($/oz Au)1 891692
All-in sustaining cash cost ($/oz Au)1 1,4241,038
Capital Expenditures ($000's) 2
Sustaining7,745 3,125
Non-sustaining187 169
Brownfields144

1 Cash cost and AISC are non-IFRS financial measures; refer to non-IFRS financial measures section at the end of this news release and to the MD&A accompanying the Company’s financial statements filed on SEDAR at www.sedar.com for a description of the calculation of these measures.
2 Capital expenditures are presented on a cash basis.

Quarterly Operating and Financial Highlights

In the first quarter of 2023, a total of 1,478,148 tonnes of ore were placed on the heap leach pad, with an average gold grade of 0.71 g/t, containing and estimated 33,510 ounces of gold. Gold production for Q1 2023 totaled 25,258 ounces, representing a 16% decrease year-over-year. The decline in gold production can primarily be attributed to a decrease in the head grade of mineralized material placed on the leach pad, which is aligned with the planned mining sequence. Mine production was 1.6 million tonnes of mineralized material, with a strip ratio of 1.07:1. This stripping ratio is consistent with the operation's plan for the year, which anticipates a ratio of 1.17:1.

Cash cost per ounce of gold for Q1 2023, was $891 compared to $692 in the Q1 2022. Cash cost per ounce of gold was higher due to lower production, higher prices of key consumables due to inflation, higher equipment rental costs due to lower fleet availability, and timing of plant maintenance. This was partially offset by higher stripping capitalization.

All-in sustaining cash cost per gold ounce sold was $1,424 during Q1 2023 compared with $1,038 in Q1 2022. All-in sustaining cash cost for Q1 2023 was impacted by the cost issues described above, compounded by lower ounces sold and higher sustaining capital spend, partially offset by a positive by-product effect from copper.

During the quarter, sustaining capital expenditures were primarily a result of Phase II expansion of the leach pad, routine maintenance, and several minor projects. There were no brownfields exploration capital investments made within this period.

Yaramoko Mine Complex, Burkina Faso

Three months ended March 31,
20232022
Mine Production
Tonnes milled 139,650127,968
Gold
Grade (g/t) 5.947.50
Recovery (%) 9798
Production (oz) 26,43728,235
Metal sold (oz) 29,53029,530
Realized price ($/oz) 1,8991,878
Unit Costs
Cash cost ($/oz Au)1 819705
All-in sustaining cash cost ($/oz Au)1 1,5091,147
Capital Expenditures ($000's) 2
Sustaining13,549 7,361
Brownfields1,191 488

1 Cash cost and AISC are non-IFRS financial measures; refer to non-IFRS financial measures section at the end of this news release and to the MD&A accompanying the Company’s financial statements filed on SEDAR at www.sedar.com for a description of the calculation of these measures.
2 Capital expenditures are presented on a cash basis.

The Yaramoko Mine produced 26,437 ounces of gold in the Q1 2023 with an average gold head grade of 5.94g/t, a 6% decrease, respectively, when compared to Q1 2022. Higher mill throughput contributed positively to the operation, offset by reduced operating time due to planned maintenance and lower head grades. Production for the quarter was in line with the mining sequence and Mineral Reserves estimate.

Underground mineralized material was sourced from the 55 Zone, with development also contributing from outside of the current resource boundary on the western side of the deposit.

Cash cost per ounce of gold sold in Q1 2023, was $819, compared to $705 in Q1 2022. Cash cost per ounce increased due to higher processing costs resulting from increased maintenance costs and the impact of inflation on key consumables and mining costs. Processing costs were also higher as a result of processing of increased tonnes at lower grades.

All-in sustaining cash cost per gold ounce sold was $1,509 for Q1 2023, compared to $1,147 in Q1 2022. This increase was as a result of a decrease in production, increased cash cost, and higher capital expenditures.

Sustaining capital in Q1 2023 increased due to higher mine development. Brownfields expenditure was primarily higher due to an increase in diamond drilling meters.

San Jose Mine, Mexico

Three months ended March 31,
20232022
Mine Production
Tonnes milled 246,736250,947
Average tonnes milled per day 2,8692,918
Silver
Grade (g/t) 181185
Recovery (%) 9191
Production (oz) 1,303,3121,358,189
Metal sold (oz) 1,328,3331,316,193
Realized price ($/oz) 22.5824.27
Gold
Grade (g/t) 1.151.13
Recovery (%) 9090
Production (oz) 8,2318,239
Metal sold (oz) 8,3557,952
Realized price ($/oz) 1,9001,890
Unit Costs
Production cash cost ($/t)2 86.6676.05
Production cash cost ($/oz Ag Eq)1,2 11.4210.42
All-in sustaining cash cost ($/oz Ag Eq)1,2 15.5115.32
Capital Expenditures ($000's) 3
Sustaining3,772 3,575
Non-sustaining269 415
Brownfields1,088 1,529

1 Production cash cost per ounce of silver equivalent and all-in sustaining cash cost per ounce of silver equivalent are calculated using realized metal prices for each period respectively.
2 Production cash cost per tonne, production cash cost per ounce of silver equivalent, and all-in sustaining cash cost per ounce of silver equivalent are non-IFRS financial measures, refer to non-IFRS financial measures section at the end of this news release and to the MD&A accompanying the Company’s financial statements filed on SEDAR at www.sedar.com for a description of the calculation of these measures.
3 Capital expenditures are presented on a cash basis.

In the first quarter of 2023, the San Jose Mine produced 1,303,312 ounces of silver and 8,231 ounces of gold, 4% and unchanged, respectively, when compared to Q1 2022. Production for the quarter was aligned with the mining sequence and Mineral Reserves estimate.

The cash cost per tonne for Q1 2023, was $86.66 compared to $76.05 in Q1 2022. The increase was primarily due to inflation and the appreciation of the Mexican Peso, affecting consumables, labor costs and other services paid in local currency.

All-in sustaining cash costs of payable per ounce of silver equivalent for Q1 2023, increased 2% to $15.58 per ounce, compared to $15.32 in Q1 2022. The increase was due to higher cash costs partially offset by lower sustaining capital expenditures and increased silver equivalent production, mainly due to lower silver prices.

In the first quarter of 2023, sustaining capital expenditures were lower than expected, primarily due to delays in executing purchases related to components and overhauls. This contrasts with Q1 2022, when significant planned mine acquisitions had been carried over from the previous quarter. The decrease in Q1 2023 was partially offset by an increase in expenditures related to development and infill drilling meters. Brownfields exploration expenditures faced challenges from geological and operational delays, but accelerated spending is anticipated in Q2 2023.

Caylloma Mine, Peru

Three months ended March 31,
20232022
Mine Production
Tonnes milled 125,995132,574
Average tonnes milled per day 1,4481,524
Silver
Grade (g/t) 8589
Recovery (%) 8282
Production (oz) 283,066311,939
Metal sold (oz) 263,570294,301
Realized price ($/oz) 22.2423.78
Gold
Grade (g/t) 0.150.16
Recovery (%) 2737
Production (oz) 166258
Metal sold (oz) 22325
Realized price ($/oz) 1,8951,828
Lead
Grade (%) 3.743.55
Recovery (%) 9288
Production (000's lbs) 9,5099,134
Metal sold (000's lbs) 8,7828,575
Realized price ($/lb) 1.021.06
Zinc
Grade (%) 5.214.18
Recovery (%) 9089
Production (000's lbs) 13,05110,827
Metal sold (000's lbs) 13,81510,546
Realized price ($/lb) 1.451.69
Unit Costs
Production cash cost ($/t)2 98.0789.60
Production cash cost ($/oz Ag Eq)1,2 13.1412.39
All-in sustaining cash cost ($/oz Ag Eq)1,2 16.8817.83
Capital Expenditures ($000's) 3
Sustaining2,810 3,949
Brownfields204 324

1 Production cash cost per ounce of silver equivalent and all-in sustaining cash cost per ounce of silver equivalent are calculated using realized metal prices for each period respectively.
2 Production cash cost per tonne, production cash cost per ounce of silver equivalent, and all-in sustaining cash cost per ounce of silver equivalent are non-IFRS financial measures, refer to non-IFRS financial measures section at the end of this news release and to the MD&A accompanying the Company’s financial statements filed on SEDAR at www.sedar.com for a description of the calculation of these measures.
3 Capital expenditures are presented on a cash basis.

In the first quarter of 2023, the Caylloma Mine produced 283,066 ounces of silver, 9.5 million pounds of lead, and 13.1 million pounds of zinc. Silver production was 9% lower compared to Q1 2022, but was in line with the mining sequence and Mineral Reserves estimate. Lead and zinc production rose by 4% and 21% respectively, compared to Q1 2022, due to higher head grades from levels 16 and 17 within the Animas vein, and higher tonnes. Gold production totaled 166 ounces with an average head grade of 0.15 g/t.

The cash cost per tonne of processed ore in Q1 2023 increased 9% to $98.07 compared to $89.60 in Q1 2022. The increase was mainly due to higher mining costs driven by inflation and its direct impact on the price of materials, compounded by lower tonnes processed.

The all-in sustaining cash cost per payable silver equivalent ounce in Q1 2023, decreased 3% to $17.29 per ounce, compared to $17.83 per ounce in Q1 2022. The decrease was mainly increased silver equivalent production, mainly due to lower silver prices.

Sustaining capital expenditures in Q1 2023 decreased primarily due to blockades limiting project executions. Spending on execution of the developments located on levels 15 and level 18 at the Animas vein was offset by decreased expenditure on other levels. The decrease in brownfields exploration capital expenditures was primarily due to a decrease in diamond drilling meters.

Qualified Person

Eric Chapman, Senior Vice President of Technical Services, is a Professional Geoscientist of the Association of Professional Engineers and Geoscientists of the Province of British Columbia (Registration Number 36328), and is the Company’s Qualified Person (as defined by National Instrument 43-101). Mr. Chapman has reviewed and approved the scientific and technical information contained in this news release and has verified the underlying data.

Non-IFRS Financial Measures

The Company has disclosed certain financial measures and ratios in this news release which are not defined under the International Financial Reporting Standards (“IFRS”), as issued by the International Accounting Standards Board, and are not disclosed in the Company's financial statements, including but not limited to: cash cost per ounce of gold sold; all-in sustaining cash cost per ounce of gold sold; all-in cash cost per ounce of gold sold; total production cash cost per tonne; cash cost per payable ounce of silver equivalent sold; all-in sustaining cash cost per payable ounce of silver equivalent sold; all-in cash cost per payable ounce of silver equivalent sold; free cash flow from ongoing operations; adjusted net income; adjusted EBITDA and working capital.

These non-IFRS financial measures and non-IFRS ratios are widely reported in the mining industry as benchmarks for performance and are used by management to monitor and evaluate the Company's operating performance and ability to generate cash. The Company believes that, in addition to financial measures and ratios prepared in accordance with IFRS, certain investors use these non-IFRS financial measures and ratios to evaluate the Company’s performance. However, the measures do not have a standardized meaning under IFRS and may not be comparable to similar financial measures disclosed by other companies. Accordingly, non-IFRS financial measures and non-IFRS ratios should not be considered in isolation or as a substitute for measures and ratios of the Company’s performance prepared in accordance with IFRS. The Company has calculated these measures consistently for all periods presented.

To facilitate a better understanding of these measures and ratios as calculated by the Company, descriptions are provided below. In addition see “Non-IFRS Financial Measures” in the Company’s management’s discussion and analysis for the three months ended March 31, 2023 (“Q1 2023 MDA”), which section is incorporated by reference in this news release, for additional information regarding each non-IFRS financial measure and non-IFRS ratio disclosed in this news release, including an explanation of their composition; an explanation of how such measures and ratios provide useful information to an investor and the additional purposes, if any, for which management of the Company uses such measures and ratio. The Q1 2023 MD&A may be accessed on SEDAR at www.sedar.com under the Company’s profile.

Except as otherwise described in the Q1 2023 MD&A, the Company has calculated these measures consistently for all periods presented.

Reconciliation to adjusted net income for the three months ended March 31, 2023 and 2022

Three months ended March 31,
Consolidated (in millions of US dollars)20232022
Net income11.9 27.0
Adjustments, net of tax:
Foreign exchange loss, Séguéla Project -0.6
Unrealized loss on derivatives 1.0-
Accretion on right of use assets 0.60.6
Other non-cash/non-recurring items (0.3)1.3
Adjusted Net Income 13.229.5

1 Amounts are recorded in Cost of sales
2 Amounts are recorded in General and Administration
Figures may not add due to rounding

Reconciliation to adjusted EBITDA for the three months ended March 31, 2023 and 2022

Three months ended March 31,
Consolidated (in millions of US dollars)20232022
Net (loss) income 11.927.0
Adjustments:
Community support provision and accruals (0.1)-
Foreign exchange loss, Séguéla Project -0.6
Net finance items 2.62.8
Depreciation, depletion, and amortization 44.438.1
Income taxes 7.96.8
Other non-cash/non-recurring items (1.4)5.0
Adjusted EBITDA 65.380.3

Figures may not add due to rounding

Reconciliation of free cash flow from ongoing operations for the three months ended March 31, 2023 and 2022

In 2022, the Company changed the method for calculating free cash flow from ongoing operations. The calculation now uses taxes paid as opposed to the previous method which used current income taxes. While this may create larger quarter over quarter fluctuations due to the timing of income tax payments, management believes the revised method is a better representation of the free cash flow generated by the Company’s ongoing operations. Comparative values from 2021 have been restated using the change in the methodology.

Three months ended March 31,
Consolidated (in millions of US dollars)20232022
(Restated)
Net cash provided by operating activities 41.833.2
Adjustments
Additions to mineral properties, plant and equipment (30.4)(20.5)
Other adjustments (2.9)(3.1)
Free cash flow from ongoing operations 8.59.6

Figures may not add due to rounding

Reconciliation of cash cost per ounce of gold sold for the three months ended March 31, 2023 and 2022

Lindero MineThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cost of sales 41,72535,867
Changes in doré inventory (1,331)1,017
Inventory adjustment 15739
Export duties (3,926)(4,008)
Depletion and depreciation (13,192)(12,009)
By product credits (799)-
Production cash cost1 22,49221,607
Changes in doré inventory 1,331(1,017)
Realized gain in diesel hedge -(782)
Cash cost applicable per gold ounce soldA 23,82319,808
Ounces of gold soldB 26,73928,607
Cash cost per ounce of gold sold1 ($/oz)=A/B 891692


Yaramoko MineThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cost of sales 44,86338,041
Changes in doré inventory -(1,320)
Export duties (3,362)(3,333)
Depletion and depreciation (17,368)(14,028)
By product credits -(5)
Production cash cost 24,13319,355
Changes in doré inventory -1,320
Refining charges -155
Cash cost applicable per gold ounce soldA 24,13320,830
Ounces of gold soldB 29,47229,530
Cash cost per ounce of gold sold ($/oz)=A/B 819705


Reconciliation of cash cost per ounce of gold equivalent sold for the three months ended March 31, 2023 and 2022

ConsolidatedThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cost of sales 135,219118,828
Changes in concentrate inventory and dore inventory (1,534)(115)
Cost of sales-Right of use 694-
Depletion and depreciation in concentrate inventory (173)(147)
Inventory adjustment 1112,222
Royalties, export duties and mining taxes (8,711)(8,980)
Provision for community support (25)(126)
Workers' participation (463)(1,340)
Depletion and depreciation (43,955)(37,738)
By product credits (799)(5)
Production cash cost 80,36472,599
Changes in concentrate inventory and dore inventory 1,534115
Cost of sales-Right of use (694)-
Depletion and depreciation in concentrate inventory 173147
Inventory adjustment (96)(1,483)
Realized gain in diesel hedge -(782)
Treatment charges 5,0384,786
Refining charges 1,191638
Cash cost applicable per gold equivalent ounce soldA 87,51176,021
Ounces of gold equivalent soldB 95,54198,448
Cash cost per ounce of gold equivalent sold ($/oz)=A/B 916772


Reconciliation of all-in sustaining cash cost per ounce of gold sold for the three months ended March 31, 2023 and 2022

Lindero MineThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cash cost applicable 23,82319,808
Export duties and mining taxes 3,9264,008
General and administrative expenses (operations) 1,9921,905
Adjusted operating cash cost 29,74125,721
Sustaining leases 598705
Sustaining capital expenditures1 7,7453,125
Brownfields exploration expenditures1 -144
All-in sustaining cash cost 38,08429,695
Non-sustaining capital expenditures1 187169
All-in cash cost 38,27129,864
Ounces of gold sold 26,73928,607
All-in sustaining cash cost per ounce of gold sold 1,4241,038
All-in cash cost per ounce of gold sold 1,4311,044

1 Presented on a cash basis

Yaramoko MineThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cash cost applicable 24,13320,830
Export duties and mining taxes 3,3623,333
General and administrative expenses (operations) 889410
Adjusted operating cash cost 28,38424,573
Sustaining leases 1,3591,435
Sustaining capital expenditures1 13,5497,361
Brownfields exploration expenditures1 1,191488
All-in sustaining cash cost 44,48333,857
All-in cash cost 44,48333,857
Ounces of gold sold 29,47229,530
All-in sustaining cash cost per ounce of gold sold 1,5091,147
All-in cash cost per ounce of gold sold 1,5091,147

1 Presented on a cash basis

Reconciliation of all-in sustaining cash cost per ounce of gold equivalent sold for the three months ended March 31, 2023 and 2022

ConsolidatedThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cash cost applicable 87,51176,021
Royalties, export duties and mining taxes 8,7118,980
Workers' participation 5381,614
General and administrative expenses (operations) 5,8274,963
General and administrative expenses (Corporate) 8,68111,339
Adjusted operating cash cost 111,268102,917
Care and maintenance costs (impact of COVID-19) -2
Sustaining leases 2,9753,005
Sustaining capital expenditures3 27,87618,010
Brownfields exploration expenditures3 2,4832,485
All-in sustaining cash cost 144,602126,419
Payable ounces of gold equivalent sold 95,54198,448
All-in sustaining cash cost per ounce of gold equivalent sold 1,5141,284

Gold equivalent was calculated using the realized prices for gold of $1,893/oz Au, $22.5/oz Ag, $2,256/t Pb, and $3,197/t Zn for Q1 2023 and using the realized prices for gold of $1,884/oz Au, $24.2/oz Ag, $2,331/t Pb, and $3,736/t Zn for Q1 2022

Reconciliation of production cash cost per tonne and cash cost per payable ounce of silver equivalent sold for the three months ended March 31, 2023 and 2022

San Jose MineThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cost of sales 32,52328,899
Changes in concentrate inventory 7177
Cost of sales-right of use 133-
Depletion and depreciation in concentrate inventory (29)(21)
Inventory adjustment (129)537
Royalties and mining taxes (1,257)(1,392)
Workers participation (17)(727)
Depletion and depreciation (9,912)(8,287)
Cash cost3A 21,38319,086
Total processed ore (tonnes)B 246,736250,947
Production cash cost per tonne3 ($/t)=A/B 86.6676.05
Cash cost3A 21,38319,086
Changes in concentrate inventory (71)(77)
Depletion and depreciation in concentrate inventory 2921
Inventory adjustment 129(537)
Treatment charges (220)872
Refining charges 94491
Cash cost applicable per payable ounce sold3C 22,19419,456
Payable ounces of silver equivalent sold1D1,944,2651,867,871
Cash cost per ounce of payable silver equivalent sold2,3 ($/oz)=C/D 11.4210.42
Mining cost per tonne3 39.0537.45
Milling cost per tonne 20.3918.01
Indirect cost per tonne 19.5614.63
Community relations cost per tonne 1.854.84
Distribution cost per tonne 5.811.12
Production cash cost per tonne3 ($/t) 86.6676.05

1 Silver equivalent sold for Q1 2023 is calculated using a silver to gold ratio of 81.2:1 (Q1 2022: 77.9:1).  
2 Silver equivalent is calculated using the realized prices for gold and silver. Refer to Financial Results – Sales and Realized Prices

Caylloma MineThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cost of sales 16,10816,021
Changes in concentrate inventory (274)111
Cost of sales-right of use 561-
Depletion and depreciation in concentrate inventory (144)(126)
Inventory adjustment 225272
Royalties and mining taxes (166)(247)
Provision for community support (25)(126)
Workers participation (446)(613)
Depletion and depreciation (3,483)(3,414)
Cash cost3A 12,35611,878
Total processed ore (tonnes)B 125,996132,574
Production cash cost per tonne3 ($/t)=A/B 98.0789.60
Cash costA 12,35611,878
Changes in concentrate inventory 274(111)
Depletion and depreciation in concentrate inventory 144126
Inventory adjustment (225)(272)
Treatment charges 5,2593,914
Refining charges 247392
Cash cost applicable per payable ounce sold3C 18,05515,927
Payable ounces of silver equivalent sold1D1,373,6991,285,610
Cash cost per ounce of payable silver equivalent sold2,3 ($/oz)=C/D 13.1412.39
Mining cost per tonne 43.0635.29
Milling cost per tonne 15.6816.23
Indirect cost per tonne 29.4030.60
Community relations cost per tonne 0.617.04
Distribution cost per tonne 9.320.45
Production cash cost per tonne3 ($/t) 98.0789.60

1 Silver equivalent sold for Q1 2023 is calculated using a silver to gold ratio of 0.0:1 (Q1 2022: 76.9:1), silver to lead ratio of 1:22.3 pounds (Q1 2022: 1:22.5), and silver to zinc ratio of 1:15.7 pounds (Q1 2022: 1:14.0).  
2 Silver equivalent is calculated using the realized prices for gold, silver, lead, and zinc. Refer to Financial Results - Sales and Realized Prices

Reconciliation of all-in sustaining cash cost and all-in cash cost per payable ounce of silver equivalent sold for the three months ended March 31, 2023 and 2022

San Jose MineThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cash cost applicable4 22,19419,456
Cost of sales-right of use (133)-
Royalties and mining taxes 1,2571,392
Workers' participation 21909
General and administrative expenses (operations) 1,8021,590
Adjusted operating cash cost4 25,14123,347
Care and maintenance costs (impact of COVID-19) -2
Sustaining leases 162157
Sustaining capital expenditures3 3,7723,575
Brownfields exploration expenditures3 1,0881,529
All-in sustaining cash cost 30,16328,610
Non-sustaining capital expenditures3 269415
All-in cash cost 30,43229,025
Payable ounces of silver equivalent sold1 1,944,2651,867,871
All-in sustaining cash cost per ounce of payable silver equivalent sold2 15.5115.32
All-in cash cost per ounce of payable silver equivalent sold2 15.6515.54

1 Silver equivalent sold for Q1 2023 is calculated using a silver to gold ratio of 81.2:1 (Q1 2022: 77.9:1).  
2 Silver equivalent is calculated using the realized prices for gold and silver. Refer to Financial Results - Sales and Realized Prices  
3 Presented on a cash basis

Caylloma MineThree months ended March 31,
(Expressed in $'000's, except unit costs)20232022
Cash cost applicable4 18,05515,927
Cost of sales-right of use (561)-
Royalties and mining taxes 166247
Workers' participation 517705
General and administrative expenses (operations) 1,1441,058
Adjusted operating cash cost4 19,32117,937
Sustaining leases 856708
Sustaining capital expenditures3 2,8103,949
Brownfields exploration expenditures3 204324
All-in sustaining cash cost 23,19122,918
All-in cash cost 23,19122,918
Payable ounces of silver equivalent sold1 1,373,6991,285,610
All-in sustaining cash cost per ounce of payable silver equivalent sold2 16.8817.83
All-in cash cost per ounce of payable silver equivalent sold2 16.8817.83

1 Silver equivalent sold for Q1 2023 is calculated using a silver to gold ratio of 0.0:1 (Q1 2022: 76.9:1), silver to lead ratio of 1:22.3 pounds (Q1 2022: 1:22.5), and silver to zinc ratio of 1:15.7 pounds (Q1 2022: 1:14.0).  
2 Silver equivalent is calculated using the realized prices for gold, silver, lead, and zinc. Refer to Financial Results - Sales and Realized Prices
3 Presented on a cash basis

Additional information regarding the Company’s financial results and activities underway are available in the Company’s audited consolidated financial statements for the three months ended March 31, 2023 and accompanying Q1 2023 MD&A, which are available for download on the Company’s website, www.fortunasilver.com, on SEDAR at www.sedar.com and on EDGAR at www.sec.gov/edgar.

Conference Call and Webcast

A conference call to discuss the financial and operational results will be held on Tuesday, May 16, 2023 at 9:00 a.m. Pacific time | 12:00 p.m. Eastern time. Hosting the call will be Jorge A. Ganoza, President and CEO; Luis D. Ganoza, Chief Financial Officer; Cesar Velasco, Chief Operating Officer - Latin America; David Whittle, Chief Operating Officer - West Africa; and Paul Weedon, Senior Vice President Exploration.

Shareholders, analysts, media and interested investors are invited to listen to the live conference call by logging onto the webcast at https://www.webcaster4.com/Webcast/Page/1696/48290 or over the phone by dialing in just prior to the starting time.

Conference call details:

Date: Tuesday, May 16, 2023
Time: 9:00 a.m. Pacific time | 12:00 p.m. Eastern time

Dial in number (Toll Free): +1.888.506.0062
Dial in number (International): +1.973.528.0011
Access code: 256829

Replay number (Toll Free): +1.877.481.4010
Replay number (International): +1.919.882.2331
Replay passcode: 48290

Playback of the earnings call will be available until Tuesday, May 30, 2023. Playback of the webcast will be available until Thursday, May 16, 2024.

About Fortuna Silver Mines Inc.

Fortuna Silver Mines Inc. is a Canadian precious metals mining company with four operating mines in Argentina, Burkina Faso, Mexico, and Peru, and our fifth mine under construction in Côte d’Ivoire. Sustainability is integral to all our operations and relationships. We produce gold and silver and generate shared value over the long-term for our stakeholders through efficient production, environmental protection, and social responsibility. For more information, please visit our website.

ON BEHALF OF THE BOARD

Jorge A. Ganoza
President, CEO, and Director
Fortuna Silver Mines Inc.

Investor Relations:

Carlos Baca | info@fortunasilver.com | www.fortunasilver.com | Twitter | LinkedIn | YouTube

Forward-looking Statements

This news release contains forward-looking statements which constitute "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995 (collectively, "Forward-looking Statements"). All statements included herein, other than statements of historical fact, are Forward-looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the Forward-looking Statements. The Forward-looking Statements in this news release include, without limitation, statements about the Company's plans for its mines and mineral properties; the Company’s anticipated financial and operational performance in 2023; estimated production and costs of production for 2023, including grade and volume of metal produced and sales, revenues and cashflows, and capital costs (sustaining and non-sustaining), and operating costs, including projected production cash costs and all-in sustaining costs; the ability of the Company to mitigate the inflationary pressures on supplies used in its operations; estimated capital expenditures and estimated exploration spending in 2023, including amounts for exploration activities at its properties; the Company’s plans for the transition from construction to operations of a mine at the Séguéla project in Cote d’Ivoire; the economics for the construction of the mine at the Séguéla project, including the estimated construction capital expenditures for the project, the timelines and schedules for the construction and production of gold at the Séguéla project; statements regarding the Company's liquidity, access to capital; the impact of high inflation on the costs of production and the supply chain; the impact of COVID-19 on the Company’s operations; the Company's business strategy, plans and outlook; the merit of the Company's mines and mineral properties; mineral resource and reserve estimates, metal recovery rates, concentrate grade and quality; changes in tax rates and tax laws, requirements for permits, anticipated approvals and other matters. Often, but not always, these Forward-looking Statements can be identified by the use of words such as "estimated", “expected”, “anticipated”, "potential", "open", "future", "assumed", "projected", "used", "detailed", "has been", "gain", "planned", "reflecting", "will", "containing", "remaining", "to be", or statements that events, "could" or "should" occur or be achieved and similar expressions, including negative variations.

Forward-looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties and factors include, among others, changes in general economic conditions and financial markets; the risks relating to a global pandemic, including the COVID-19 pandemic, as well as risks associated with war or other geo-political hostilities, such as the Ukrainian – Russian conflict, any of which could continue to cause a disruption in global economic activity; fluctuation in currencies and foreign exchange rates; increases in the rate of inflation; the imposition or any extension of capital controls in countries in which the Company operates; any changes in tax laws in Argentina and the other countries in which we operate; changes in the prices of key supplies; technological and operational hazards in Fortuna’s mining and mine development activities; risks inherent in mineral exploration; uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; changes to current estimates of mineral reserves and resources; changes to production and cost estimates; the ability of Minera Cuzcatlan to successfully contest and revoke the resolution of SEMARNAT which revoked the environmental impact authorization at the San Jose mine; changes in the position of regulatory authorities with respect to the granting of approvals or permits; governmental and other approvals; changes in government, political unrest or instability in countries where Fortuna is active; labor relations issues; as well as those factors discussed under “Risk Factors” in the Company's Annual Information Form. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward-looking Statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended.

Forward-looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to the accuracy of the Company’s current mineral resource and reserve estimates; that the Company’s activities will be conducted in accordance with the Company’s public statements and stated goals; that there will be no material adverse change affecting the Company, its properties or changes to production estimates (which assume accuracy of projected ore grade, mining rates, recovery timing, and recovery rate estimates and may be impacted by unscheduled maintenance, labour and contractor availability and other operating or technical difficulties); the construction at the Séguéla gold Project will continue on the time line and in accordance with the budget as planned; the duration and impacts of COVID-19; geo-political uncertainties that may affect the Company’s production, workforce, business, operations and financial condition; tthe expected trends in mineral prices and currency exchange rates; that the Company will be successful in mitigating the impact of inflation on its business and operations; that Minera Cuzcatlan will be successful in the legal proceedings to reinstate the environmental impact authorization at the San Jose mine; that all required approvals and permits will be obtained for the Company’s business and operations on acceptable terms; that there will be no significant disruptions affecting the Company's operations, the ability to meet current and future obligations and such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward-looking Statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can be no assurance that these Forward-looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward-looking Statements.

Cautionary Note to United States Investors Concerning Estimates of Reserves and Resources

Reserve and resource estimates included in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by a Canadian company of scientific and technical information concerning mineral projects. Unless otherwise indicated, all mineral reserve and mineral resource estimates contained in the technical disclosure have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on Mineral Resources and Reserves. Canadian standards, including NI 43-101, differ significantly from the requirements of the Securities and Exchange Commission, and mineral reserve and resource information included in this news release may not be comparable to similar information disclosed by U.S. companies.

To view this piece of content from www.globenewswire.com, please give your consent at the top of this page.
To view this piece of content from ml.globenewswire.com, please give your consent at the top of this page.

About GlobeNewswire by notified

GlobeNewswire by notified
GlobeNewswire by notified
One Liberty Plaza - 165 Broadway
NY 10006 New York

https://notified.com

GlobeNewswire by notified is one of the world's largest newswire distribution networks, specializing in the delivery of corporate press releases financial disclosures and multimedia content to the media, investment community, individual investors and the general public.

Subscribe to releases from GlobeNewswire by notified

Subscribe to all the latest releases from GlobeNewswire by notified by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from GlobeNewswire by notified

Nokia Corporation: Repurchase of own shares on 19.04.202419.4.2024 21:30:00 CEST | Press release

Nokia Corporation Stock Exchange Release 19 April 2024 at 22:30 EEST Nokia Corporation: Repurchase of own shares on 19.04.2024 Espoo, Finland – On 19 April 2024 Nokia Corporation (LEI: 549300A0JPRWG1KI7U06) has acquired its own shares (ISIN FI0009000681) as follows: Trading venue (MIC Code)Number of sharesWeighted average price / share, EUR*XHEL430,8933.30CEUX--BATE--AQEU--TQEX--Total430,8933.30 * Rounded to two decimals On 25 January 2024, Nokia announced that its Board of Directors is initiating a share buyback program to return up to EUR 600 million of cash to shareholders in tranches over a period of two years. The first phase of the share buyback program in compliance with the Market Abuse Regulation (EU) 596/2014 (MAR), the Commission Delegated Regulation (EU) 2016/1052 and under the authorization granted by Nokia’s Annual General Meeting on 4 April 2023 started on 20 March 2024 and ends by 18 December 2024 with a maximum aggregate purchase price of EUR 300 million. Total cost of

Landsbankinn hf.: Results of the 2024 AGM of Landsbankinn19.4.2024 20:48:08 CEST | Press release

The annual general meeting (AGM) of Landsbankinn, held on 19 April 2024, agreed to pay a dividend amounting to ISK 16,535 million to shareholders. The dividend is equivalent to 50% of 2023 profits. The dividend will be paid in two instalments, firstly on 24 April 2024 and secondly on 16 October 2024. As a result, total dividend paid by the Bank in 2013-2024 amounts to ISK 191.7 billion. At the AGM, held in Reykjastræti 6, Helga Björk Eiríksdóttir, Chairman of the Board of Directors, delivered the report from the Board for 2023. Lilja Björk Einarsdóttir, CEO, spoke of the Bank’s operation, strategy and activities in the past operating year. The annual financial statement for the past operating year was approved, as was the proposed Remuneration Policy and remuneration to Directors of the Board. The AGM elected the Auditor General (Ríkisendurskoðun) as auditor of Landsbankinn hf. for the 2024 operating year. The Auditor General, in accordance with an authorisation to outsource tasks, and

SKEL fjárfestingafélag hf.: Styrkás finalizes the purchase of Stólpi Gámar ehf. and affiliated companies.19.4.2024 19:20:57 CEST | Press release

Reference is made to the announcement dated 31 January 2024, regarding Styrkás hf., a company 69.64% owned by SKEL fjárfestingafélag hf., signing a purchase agreement to acquire 100% of the shares in six subsidiaries of Máttarstólpi ehf. The purchase agreement was subject to the approval of the Competition Authority. The transaction was finalized today with payment of purchase price and delivering of shares in the following companies: - Stólpi Gámar ehf., id. 460121-1590, Klettagörðum 5, 104 Reykjavík: - Stólpi Smiðja ehf., id. 460121-1750, Klettagörðum 5, 104 Reykjavík; - Klettskjól ehf., id. 460121-0510, Klettagörðum 5, 104 Reykjavík; - Stólpi ehf., 460121-0430, Klettagörðum 5, 104 Reykjavík; - Tjónaþjónustan ehf., id. 460121-1670, Klettagörðum 5, 104 Reykjavík; - Alkul ehf., id. 491020-0830, Haukdælabraut 48, 113 Reykjavík. collectively referred to as "the sold companies". These companies will continue to be operated on a consolidated basis. The Enterprise value of the sold companie

Subsea 7 S.A. notification of major holding19.4.2024 19:12:34 CEST | Press release

Luxembourg –19 April 2024 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced that, on 19 April 2024, Barclays Capital Securities Limited1 informed the Company that it had breached thresholds provided for by Luxembourg’s Transparency Law of 11 January 2008 on transparency requirements for issuers of securities as amended (the “Transparency Law”) as follows: 15 April 2024 On 15 April 2024 the total number of voting rights in the Company according to Article 8 and 9 of the Transparency Law attached to shares held by Barclays was 22,559 representing less than 0.01% of the voting rights in the CompanyOn 15 April 2024 the total number of voting rights in the Company attached to financial instruments with similar economic effect according to Article 12 (1) (a) of the Transparency Law (right to recall) were 14,625,242 representing 4.80% of the voting rights in the CompanyOn 15 April 2024 the total number of voting rights in the Company attached to financial instruments with similar

HiddenA line styled icon from Orion Icon Library.Eye