GlobeNewswire by notified

Bombardier Celebrates Graduation of First Cohort of Red Oak, Texas-based Apprentices in Comprehensive Training Program

Share
  • Department of Labor (DOL) nationally accredited apprenticeship program allows Bombardier to attract talented individuals from across the U.S. to grow dedicated talent pool in Red Oak
  • Graduates of the program offered full-time employment to support development of Global 7500 advanced smooth flex wing at Red Oak facility
  • Program fuels local grassroots aerospace pipeline

RED OAK, Texas, Nov. 04, 2021 (GLOBE NEWSWIRE) -- Bombardier today announced the graduation of 10 participants from its first cohort of apprentices enrolled in its comprehensive apprenticeship training program developed in association with Texas State Technical College (TSTC) in Red Oak, Texas. With the successful completion of the training program, graduates are offered full-time employment at Bombardier’s Red Oak facility as an aircraft assembler or aerostructures apprentice to work on the Global 7500 business jet’s advanced smooth flex wing.

The two-year Department of Labor (DOL) accredited Bombardier Aerospace Apprenticeship Program (BAAP), launched in December 2019, offers students the opportunity to enter the high-tech aerospace sector with no specific pre-requisites. It challenges them to present a winning attitude and develop mechanical dexterity and sound logic skills to pass an entry-level aptitude test. In turn, Bombardier and TSTC offer expert training in conjunction with TSTC’s excellent facilities, allowing students to benefit at no cost from industry-tailored modules, experienced instructors, tools and equipment and financial support. Since its inception, some 80-plus individuals are currently being trained in the program. Bombardier and TSTC plan to recruit more than 50 individuals into the program over the next two years.

“I am thrilled to celebrate the successful graduation of the women and men in the BAAP program who will now transition forward in new careers at Bombardier, helping to ramp up the development of Bombardier’s Global 7500 program,” said Paul Sislian, Executive Vice President, Operations and Operational Excellence, Bombardier. “The accomplishments of these talented individuals aptly underscore the importance of fueling the aerospace pipeline in our Red Oak facility, bringing world-class training opportunities and cementing Bombardier as a key pillar of the community. It’s a wonderful way for Bombardier to celebrate National Apprenticeship Week in the U.S.”

The apprenticeship program offers a unique blend of practical and on-the-job training with theoretical, in-class learning. Educational topics covered include the introduction of health, safety and quality best practices, as well as aircraft drawing and specification comprehension, manufacturing appreciation of standard and regulatory compliances of aircraft assembly and more.

The Global 7500 jet is the flagship of the Bombardier business aircraft fleet, and it has won numerous awards for its innovative design. The Global 7500 aircraft’s advanced smooth flex wing design features sophisticated slats and flap system that maximizes aerodynamic efficiency and performance for improved safety and an exceptionally smooth ride.

About Texas State Technical College
TSTC was established 50 years ago to help create a strong Texas. It is efficiently and effectively helping Texas meet the high-tech challenges of today’s global economy, in partnership with business and industry, government agencies and other educational institutions. TSTC graduates are highly valued by business and industry for their work ethics, knowledge and workplace skills.

About Bombardier
Bombardier is a global leader in aviation, creating innovative and game-changing planes. Our products and services provide world-class experiences that set new standards in passenger comfort, energy efficiency, reliability and safety.

Headquartered in Montréal, Canada, Bombardier is present in more than 12 countries including its production/engineering sites and its customer support network. The Corporation supports a worldwide fleet of over 4,900 aircraft in service with a wide variety of multinational corporations, charter and fractional ownership providers, governments and private individuals.

News and information is available at bombardier.com or follow us on Twitter @Bombardier.
Visit the Bombardier Business Aircraft website for more information on our industry-leading products and services.

Bombardier, Global and Global 7500 are registered or unregistered trademarks of Bombardier Inc. or its subsidiaries.

For information
Matthew Nicholls
Bombardier
+1 514-243-8214
Matthew.Nicholls@aero.bombardier.com

To view this piece of content from www.globenewswire.com, please give your consent at the top of this page.
To view this piece of content from ml.globenewswire.com, please give your consent at the top of this page.

About GlobeNewswire by notified

GlobeNewswire by notified
GlobeNewswire by notified
One Liberty Plaza - 165 Broadway
NY 10006 New York

https://notified.com

GlobeNewswire by notified is one of the world's largest newswire distribution networks, specializing in the delivery of corporate press releases financial disclosures and multimedia content to the media, investment community, individual investors and the general public.

Subscribe to releases from GlobeNewswire by notified

Subscribe to all the latest releases from GlobeNewswire by notified by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from GlobeNewswire by notified

Galapagos increases share capital through subscription right exercises3.12.2021 22:01:00 CET | Press release

Mechelen, Belgium; 3 December 2021, 22.01 CET; regulated information – Galapagos NV (Euronext & NASDAQ: GLPG) announces a share capital increase arising from subscription right exercises. Galapagos issued 22,600 new ordinary shares on 3 December 2021, for a total capital increase (including issuance premium) of €578,700.00. Pursuant to the subscription right exercise program of Galapagos’ management board, members of the management board automatically are committed to exercise a minimum number of subscription rights, subject to certain conditions. In accordance with the rules of this program, one management board member exercised 5,000 subscription rights. In accordance with Belgian transparency legislation1, Galapagos notes that its total share capital currently amounts to €354,582,005.11, the total number of securities conferring voting rights amounts to 65,552,721, which is also the total number of voting rights (the “denominator”), and all securities conferring voting rights and al

Sampo plc’s share buybacks 03/12/20213.12.2021 21:30:00 CET | Press release

SAMPO PLC STOCK EXCHANGE RELEASE 03/12/2021 at 10:30 pm Sampo plc’s share buybacks 03/12/2021 On 03/12/2021 Sampo plc (business code 0142213-3, LEI 743700UF3RL386WIDA22) has acquired its own A shares (ISIN code FI0009003305) as follows: Sampo plc’s share buybacksAggregated daily volume (in number of shares)Daily weighted average price of the purchased shares*Market (MIC Code)23,68743.29AQEU27,42643.28CEUX4,32043.37TQEX72,59243.31XHELTOTAL128,02543.30 *rounded to two decimals On 1 October 2021, Sampo announced a share buyback programme of up to a maximum of EUR 750 million in compliance with the Market Abuse Regulation (EU) 596/2014 (MAR) and the Commission Delegated Regulation (EU) 2016/1052. The programme, which started on 4 October 2021, is based on the authorization granted by Sampo's Annual General Meeting on 19 May 2021. After the disclosed transactions, the company owns in total 6,263,553 Sampo A shares representing 1.13 per cent of the total number of shares in Sampo plc. Detail

Projekt Öyfjellet försenat – beräknas färdigställas under första kvartalet 20223.12.2021 21:15:00 CET | Pressemelding

Hässleholm den 3 december 2021 I delårsrapporten för det tredje kvartalet, som offentliggjordes den 18 november 2021, kommunicerade Eolus att det finns risk för försening i färdigställandet av det norska 400 MW projektet Öyfjellet. Baserat på uppdaterad information om byggprocessen beräknar Eolus nu att vindparken färdigställs under det första kvartalet 2022. Per idag, den 3 december 2021, har samtliga 72 turbiner färdigmonterats. 34 turbiner har börjat generera el. Huvudskälen till förseningen är utmanande väderförhållanden, vilket har påverkat installationsarbetet, samt Covid-19 relaterade orsaker som begränsat både resemöjligheterna för personal och lett till leveransförseningar avseende komponenter. Förseningen kommer att ha en negativ påverkan på Eolus projektmarginal. För ytterligare information kontakta: Per Witalisson, VD, telefon +46 (0)70-265 16 15 Johan Hammarqvist, kommunikationschef, telefon +46 (0)720-50 59 11 Kort om Eolus Eolus Vind är en av Nordens ledande projektörer

Project Øyfjellet delayed - new estimated completion in the first quarter of 20223.12.2021 21:15:00 CET | Press release

Hässleholm, Sweden, December 3rd, 2021 In the interim report for the third quarter, released on November 18, 2021, Eolus communicated a risk of delay in the completion of the 400 MW Norwegian wind project Øyfjellet. Based on updated information of the construction progress, Eolus now estimates that the wind farm will be completed during the first quarter of 2022. As of today, December 3, 2021, construction of all 72 turbines have been completed. First electricity production has been achieved by 34 turbines. The main reasons for the delay are challenging weather conditions which has effected the progress of the installations and Covid-19 related issues which has restricted both travel possibilities for personnel and led to delays in delivery of components. The delay is expected to have a negative impact on Eolus’ profit margin for the construction of the project. For further information contact: Per Witalisson, CEO, +46 70-265 16 15 Johan Hammarqvist, Head of Communications, +46 720 50

ING reports outcome of 2021 EU-wide Transparency Exercise and Risk Assessment Report3.12.2021 18:12:26 CET | Press release

ING reports outcome of 2021 EU-wide Transparency Exercise and Risk Assessment Report ING notes the announcements made today by the European Banking Authority (EBA) and the European Central Bank (ECB) regarding the information of the 2021 EU-wide Transparency Exercise and Risk Assessment Report. Background EU‐wide Transparency Exercise The EBA Board of Supervisors approved the package for the EU‐wide Transparency Exercise, which since 2016 is performed on an annual basis and published along with the Risk Assessment Report (RAR). The annual transparency exercise is based solely on regulatory reporting data (COREP/FINREP) on the form and scope to assure a sufficient and appropriate level of information to market participants. The templates were centrally filled in by the EBA and sent afterwards for verification by banks and supervisors. The outcome of the exercise related to ING Group can be found in the annexes on the EBA website. Note for editors For further information on ING, please v

KBC Group: KBC report on the 2021 EBA Transparency Exercise3.12.2021 18:10:00 CET | Press release

Press Release Outside trading hours - Regulated information* Brussels, 3 December 2021 – after trading hours KBC report on the 2021 EBA Transparency Exercise KBC notes the announcements made today by the European Banking Authority (EBA) and the European Central Bank (ECB) regarding the publication of the EU-wide Transparency Exercise. The information of this 2021 EU-wide Transparency Exercise refers to the reported data as of 30 September 2020, 31 December 2020, 31 March 2021 and 30 June 2021. The templates, published on a bank-by-bank basis, are the following: Key MetricsLeverage ratioCapitalRisk exposure amountsP&LTotal Assets: fair value and impairment distributionLiabilitiesMarket RiskCredit RiskGeneral governments exposuresPerforming and Non-Performing ExposuresForborne ExposuresLoans and advances to non-financial corporationsCovid-19 The data collection relies on the standard information reported by the banks to the EBA on a regular basis through the supervisory reporting framewo

Changes in the Board of Directors3.12.2021 17:40:00 CET | Press release

Basel, 3 December 2021 - Roche (SIX: RO, ROG; OTCQX: RHHBY) today announced that at its December meeting the Board of Directors of Roche Holding Ltd has approved first proposals to the Annual General Meeting (AGM) scheduled for 15 March 2022. Mr Paul Bulcke, who has been serving on the Board of Directors since 2011, has decided not to stand for re-election at the AGM in 2022, following almost eleven years of tenure. The Board of Directors proposes Dr Jemilah Mahmood, currently the Special Advisor on Public Health to Malaysia’s prime minister, for election to the Board of Directors at the AGM 2022. “As a member of the Board and of the Audit Committee, Paul Bulcke has made significant contributions to Roche’s success,” said Roche Chairman Christoph Franz. “On behalf of the Board of Directors, I would like to extend our sincere thanks to Paul Bulcke who gave great support to Roche with his enormous leadership experience and his strong entrepreneurial thinking.” Christoph Franz added: “I a