Monument Reports Second Quarter Fiscal 2026 Results

2.3.2026 15:15:00 CET | GlobeNewswire by notified | Press release

Share

Gross Revenue of US$49.23 Million and Cash Cost of US$1,288/Oz

VANCOUVER, British Columbia, March 02, 2026 (GLOBE NEWSWIRE) -- Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) “Monument” or the “Company” today announced its financial results for the three months ended December 31, 2025 (“Q2 FY 2026”). All amounts are in United States dollars unless otherwise indicated (refer to www.sedar.com for full financial results).

President and CEO Cathy Zhai commented, "In Q2 FY 2026, gold production and sales at the Selinsing Gold Mine in Malaysia, together with favourable gold prices, contributed to strong cash flow and enhanced the Company’s financial position. During the quarter, cash reserves increased by $19.81 million to $82.65 million, providing robust liquidity to support future growth initiatives. Exploration drilling at Selinsing continued to focus on potential mine expansion opportunities, while in Western Australia, the regulatory compliance and the mine infrastructure planning have been placed in the first priority."

SECOND QUARTER OF FISCAL YEAR 2026 HIGHLIGHTS:

  • Net income of $20.16 million, or $0.06 per share for Q2 FY 2026, compared to net income of $8.84 million, or $0.03/share for Q2 FY 2025;
  • Gross margin of $31.55 million for Q2 FY 2026, a 173% increase compared to $11.54 million in Q2 FY 2025;
  • Cash on hand totaled $82.65 million at the end of Q2 FY 2026, representing an increase of $19.81 million from $62.84 million over the three-month period;
  • Working capital of $86.58 million, representing an increase of $28.04 million from $58.54 million at the end of June 30, 2025;
  • Production performance:
    • 10,249 ounces of gold produced during the three months period (Q2 FY 2025: 8,613 ounces);
    • 13,725 ounces of gold sold at a record average realized price of $4,197/oz for gross revenue of $49.23 million (Q2 FY 2025: 8,987 ounces sold at an average realized price of $2,678/oz for gross revenue of $19.80 million);
    • Cash cost of $1,288 per ounce sold (Q2 FY 2025: $918/oz), primarily attributable to higher royalties resulting from an increased average realized gold price;
    • All in sustaining cost of $1,421 per ounce sold for Q2 FY 2026, an 18% decrease compared to $1,201/oz in Q2 FY 2025.
  • Exploration drilling programs continued at Selinsing, supporting ongoing resource growth and a potential extension of mine life;
  • A Special Dividend was announced on December 11, 2025 with record date of January 5, 2026, and paid out on January 19, 2026. 

Summary of Second Quarter Fiscal Year 2026 Production and Financial performance
Three months ended Dec.31,Six months ended Dec.31,
2025202420252024
Production
Ore mined (tonnes) 251,700 177,296 421,480 315,228
Waste removed (tonnes) 2,098,027 2,061,571 3,847,404 4,374,570
Gold Sulphide Production
Ore processed (tonnes) 224,704 169,636 464,151 359,312
Average mill feed grade (g/t) 1.54 1.83 1.74 1.78
Processing recovery rate (%) 92.49 86.09 89.67 81.01
Gold produced (oz) (1) 10,249 8,613 23,340 16,672
Gold sold (oz) 13,725 8,987 24,952 18,257
Financial (expressed in thousands of US$)$$$$
Revenue 49,230 19,796 81,630 39,167
Gross margin from mining operations 31,547 11,541 53,979 23,152
Net Income before other items 26,301 8,424 41,470 17,025
Net income 20,157 8,839 30,657 11,836
Cash flows provided by operations 21,902 8,722 41,088 18,398
Working capital 86,851 31,926 86,851 31,926
Earnings per share – basic and diluted (US$/share) 0.060.03 0.09 0.04
Weighted average gold priceUS$/ozUS$/ozUS$/ozUS$/oz
Realized price - sulphide production4,1972,6783,8822,613
Cash cost per ounce sold
Mining355242315243
Processing300313278299
Royalties564290443260
Operations69737175
Total cash cost per ounce sold (2)1,2889181,107877
Operation expenses 1 415
Corporate expenses 2 1016
Accretion of asset retirement obligation4646
Exploration and evaluation expenditures 27 8354
Sustaining capital expenditures99255100260
Total all-in sustaining costs per ounce sold(3) 1,421 1,201 1,248 1,158

(1)   Out of total 10,249 ounces of gold production reported in Q2 FY 2026, of which negative 35 ounces were production adjustments.
(2)   Total cash cost for sulphide plant production includes production costs such as mining, processing, tailing facility maintenance and camp administration, royalties, and operating costs such as storage, temporary mine production closure, community development cost and property fees, net of by-product credits. Cash cost excludes amortization, depletion, accretion expenses, capital costs, exploration costs and corporate administration costs.
(3)   All-in sustaining cost per ounce includes total cash costs, operation expenses, and adds sustaining capital expenditures, corporate administrative expenses for the Selinsing Gold Mine including share-based compensation, exploration and evaluation costs, and accretion of asset retirement obligations. Certain other cash expenditures, including tax payments and acquisition costs, are not included.

GOLD PRODUCTION RESULTS

  • The sulphide flotation plant produced 10,249 ounces of gold during the quarter. A total of 224,704 tonnes of sulphide ore were processed at an improved average recovery rate of 92.49%, reflecting the continued benefits of plant improvements and optimization initiatives. Despite a lower average head grade of 1.54 g/t compared to Q2 FY 2025, operational performance remained strong.
  • During Q2 FY 2026, mining activities continued to focus on Buffalo Reef and Felda Block 7. Ore mined during the quarter increased by 42% compared to Q2 FY 2025. As mining progressed into the ore zone as planned, higher ore tonnages were achieved and the stripping ratio reduced to 8.34, compared to 11.63 in Q2 FY 2025.
  • The ore processed during the quarter was 32% more than in Q2 FY 2025 due to more plant availability, optimization, and improved outputs of the new filter press, resolving the previous processing bottleneck.

FINANCIAL RESULTS

  • Gold sales in Q2 FY 2026 generated strong revenue of $49.23 million from 13,725 ounces sold at a record average realized price of $4,197 per ounce. This represents a significant improvement compared to Q2 FY 2025, when 8,987 ounces were sold at an average realized price of $2,678 per ounce. All sales during the quarter were produced from the sulphide flotation plant.
  • Mining operations, before non-cash amortization and depreciation, delivered an outstanding gross margin of $31.55 million in Q2 FY 2026, marking a 173% increase from $11.54 million in Q2 FY 2025 and reflecting the strong operational and financial performance achieved during the quarter.
  • Cash cost per gold ounce sold from the sulphide operations was $1,288 for Q2 FY 2026, compared with $918 in Q2 FY 2025. The increase was primarily attributable to a combination of factors, including higher mining costs mainly driven by greater total ore mined at lower elevations and longer haul distances, as well as increased royalty expenses resulting from a higher royalty rate, increased gold production and sales volumes, and a higher realized gold price, and lower feed grades, partially offset by improved recovery rates.
  • Net cash generated from operating activities in Q2 FY 2026 totalled $21.90 million, an increase of $13.18 million compared to $8.72 million in Q2 FY 2025. This strong growth was primarily driven by higher gross margins from increased gold concentrate sales and stronger realized gold prices.
  • The Company’s cash and cash equivalents as at December 31, 2025 were $82.65 million, an increase of $36.71 million from $45.94 million as at June 30, 2025. Current assets exceeded current liabilities by $86.58 million (June 30, 2025: $58.54 million), highlighting a strong net working capital position.

MINE DEVELOPMENT

Selinsing Gold Mine

R&D Work

Bench scale testwork was conducted using an alternative reagent for stibnite activation and new collectors for enhanced consistent gold recovery, subject to pricing and availability. Weekly laboratory bench scale testwork was carried out to compare results against plant production figures with the aim of optimizing reagent dosing, maximizing gold and antimony recoveries and maintaining concentrate quality.

Concentrate Warehouse Extension

Detailed engineering of the proposed concentrate shed extension was completed. Construction progressed well during the quarter with the structure footings, concrete floor slab and access ramps completed. Fabrication of the structural members was also completed. Overall completion was 65% at the end of the quarter.

Tailing Storage Facility Stage 7 Upgrade

A further geotechnical site investigation was completed at the TSF main, saddle and south embankments. Additional piezometer pipes were installed around the TSF to monitor the phreatic surface. Detailed Stage 7 design of the south embankments was completed by the TSF design consultants and construction was scheduled to start in Q3 FY2026. Design of the main and saddle embankments was still ongoing at the end of the quarter.

Flotation Plant and Related Facilities

Some High-Density Polyethylene (“HDPE”) pipelines were upgraded to improve slurry pump performance. High pressure lubrication oil pumps, manifolds and pipelines were replaced at the primary ball mill. The new filter press operated reliably throughout the quarter. The original filter press was run periodically as part of ongoing care and maintenance activities.

Murchison Gold Project

During Q2 FY2026, the Company finalized the scope of the Murchison Gold Project PEA and actively engaged mining and engineering consultants to advance plans for a rapid recommencement of operations. A comprehensive geological database and archive review was completed, and a confirmation drilling program was prepared for the Gabanintha tenements to validate historical drilling results and support the inclusion of selected historical resources in future mine planning.

Engagement with Traditional Owners continued constructively during the quarter to strengthen relationships and progress production planning discussions. Heritage surveys were completed, pursuant to the Interim Heritage Agreement, and the final heritage survey report covering the Gabanintha and Burnakura areas was issued after completion of field activities.

The processing plant, camp accommodation, catering, offices, and associated infrastructure were maintained in excellent condition, ensuring the site is ready to support a rapid production restart. Accommodation and catering facilities remained available throughout the quarter, providing support for administrative, exploration, and mining activities.

Exploration

Malaysia

The Buffalo Reef exploration drilling program progressed during this quarter with 12 holes completed and 2,141.4 metres drilled. The drilling program targeted extensions of oxide and sulphide mineralization in known mining areas, and potential mineral resource expansion outside of the current pit-shell, which may support an extension of the mine life, subject to further studies. By the end of the second quarter of FY 2026, a total of 4,378.1 metres had been drilled as part of the resource expansion program, and a total of 3,681 samples were prepared and dispatched to a recognized independent third-party assay laboratory.

Western Australia

During the quarter, the Company reviewed historical resources and data at the Murchison Gold Project’s Gabanintha and Burnakura deposits and completed initial planning to define infill and extension drilling targets aimed at potential resource growth.

About Monument

Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that 100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the Murchison area of Western Australia. It has 20% interest in Tuckanarra Gold Project, jointly owned by Odyssey Gold Ltd in the same region. The Company employs approximately 288 people in both regions and is committed to the highest standards of environmental management, social responsibility, including health and safety for its employees and neighboring communities and good corporate governance.

Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at www.monumentmining.com or contact:

Richard Cushing, MMY Vancouver         T: +1-604-638-1661 x102         rcushing@monumentmining.com

"Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release."

Disclaimer Regarding Forward-Looking Statements

This news release includes statements containing forward-looking information about Monument, its business and future plans ("forward-looking statements"). Forward-looking statements are statements that involve expectations, plans, objectives or future events that are not historical facts and include the Company's plans with respect to its mineral projects, expectations regarding the completion of the ramp-up period to target production level at Selinsing and the timing thereof, expectations regarding the Company’s continuing ability to source explosives from suppliers, expectations regarding completion of the proposed storage shed and ammonium nitrate depot and the timing thereof, and the timing and results of the other proposed programs and events referred to in this news release. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". The forward-looking statements in this news release are subject to various risks, uncertainties and other factors that could cause actual results or achievements to differ materially from those expressed or implied by the forward-looking statements. These risks and certain other factors include, without limitation: risks related to general business, economic, competitive, geopolitical and social uncertainties; uncertainties regarding the results of current exploration activities; uncertainties in the progress and timing of development activities, including those related to the ramp-up process at Selinsing and the completion of the proposed storage shed and ammonium nitrate depot; uncertainties and risks related to the Company’s ability to source explosives from suppliers; foreign operations risks; other risks inherent in the mining industry and other risks described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com. Material factors and assumptions used to develop forward-looking statements in this news release include: expectations regarding the estimated cash cost per ounce of gold production and the estimated cash flows which may be generated from the operations, general economic factors and other factors that may be beyond the control of Monument; assumptions and expectations regarding the results of exploration on the Company's projects; assumptions regarding the future price of gold of other minerals; the timing and amount of estimated future production; assumptions regarding the timing and results of development activities, including the ramp-up process at Selinsing and the completion of the proposed storage shed and ammonium nitrate depot; expectations that the Company will continue to be able to source explosives from suppliers in a timely manner; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; exchange rates; and all of the factors and assumptions described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities laws.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/b3ce39eb-299c-4389-bd0f-17af55ef1585

Subscribe to releases from GlobeNewswire by notified

Subscribe to all the latest releases from GlobeNewswire by notified by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from GlobeNewswire by notified

Iveco Group signs a 150 million euro term loan facility with Cassa Depositi e Prestiti to support investments in research, development and innovation11.6.2024 12:00:00 CEST | Press release

Turin, 11th June 2024. Iveco Group N.V. (EXM: IVG), a global automotive leader active in the Commercial & Specialty Vehicles, Powertrain and related Financial Services arenas, has successfully signed a term loan facility of 150 million euros with Cassa Depositi e Prestiti (CDP), for the creation of new projects in Italy dedicated to research, development and innovation. In detail, through the resources made available by CDP, Iveco Group will develop innovative technologies and architectures in the field of electric propulsion and further develop solutions for autonomous driving, digitalisation and vehicle connectivity aimed at increasing efficiency, safety, driving comfort and productivity. The financed investments, which will have a 5-year amortising profile, will be made by Iveco Group in Italy by the end of 2025. Iveco Group N.V. (EXM: IVG) is the home of unique people and brands that power your business and mission to advance a more sustainable society. The eight brands are each a

DSV, 1115 - SHARE BUYBACK IN DSV A/S11.6.2024 11:22:17 CEST | Press release

Company Announcement No. 1115 On 24 April 2024, we initiated a share buyback programme, as described in Company Announcement No. 1104. According to the programme, the company will in the period from 24 April 2024 until 23 July 2024 purchase own shares up to a maximum value of DKK 1,000 million, and no more than 1,700,000 shares, corresponding to 0.79% of the share capital at commencement of the programme. The programme has been implemented in accordance with Regulation No. 596/2014 of the European Parliament and Council of 16 April 2014 (“MAR”) (save for the rules on share buyback programmes set out in MAR article 5) and the Commission Delegated Regulation (EU) 2016/1052, also referred to as the Safe Harbour rules. Trading dayNumber of shares bought backAverage transaction priceAmount DKKAccumulated trading for days 1-25478,1001,023.01489,100,86026:3 June 20247,0001,050.597,354,13027:4 June 20245,0001,055.705,278,50028:6 June20243,0001,096.273,288,81029:7 June 20244,0001,106.174,424,68

Landsbankinn hf.: Offering of covered bonds11.6.2024 11:16:36 CEST | Press release

Landsbankinn will offer covered bonds for sale via auction held on Thursday 13 June at 15:00. An inflation-linked series, LBANK CBI 30, will be offered for sale. In connection with the auction, a covered bond exchange offering will take place, where holders of the inflation-linked series LBANK CBI 24 can sell the covered bonds in the series against covered bonds bought in the above-mentioned auction. The clean price of the bonds is predefined at 99,594. Expected settlement date is 20 June 2024. Covered bonds issued by Landsbankinn are rated A+ with stable outlook by S&P Global Ratings. Landsbankinn Capital Markets will manage the auction. For further information, please call +354 410 7330 or email verdbrefamidlun@landsbankinn.is.

Relay42 unlocks customer intelligence with a new insights and reporting module, powered by Amazon QuickSight11.6.2024 11:00:00 CEST | Press release

AMSTERDAM, June 11, 2024 (GLOBE NEWSWIRE) -- Relay42, a leading European Customer Data Platform (CDP), is leveraging Amazon QuickSight to power its new real-time customer intelligence, reporting, and dashboard module. Harnessing the breadth and quality of customer data, the new Insights module empowers marketing teams to dive deep into customer behaviors and gain invaluable insights into the performance of their marketing programs across all online, offline, paid, and owned marketing channels. Preview of the Relay42 Insights module, in pre-beta version Key capabilities of the Relay42 Insights module include: Deep insights into customer behaviors: With the Relay42 Insights module, marketers can ask unlimited questions about their data and gain a deeper understanding of how to serve their customers more effectively. Simplicity with AI-powered querying: Marketers can use artificial intelligence to query their data using natural language search, reducing the reliance on data scientists. Us

Metasphere Labs Announces X Spaces Event on the Topic of Green Bitcoin Mining and Sound Money for Sustainability11.6.2024 10:30:00 CEST | Press release

VANCOUVER, British Columbia, June 11, 2024 (GLOBE NEWSWIRE) -- Metasphere Labs Inc. (formerly Looking Glass Labs Ltd., "Metasphere Labs" or the "Company") (Cboe Canada: LABZ) (OTC: LABZF) (FRA: H1N) is thrilled to announce an engaging Twitter Spaces event on Green Bitcoin mining, energy markets, and sustainability on July 3, 2024 at 2 p.m. ET. Follow us on X at MetasphereLabs for updates and to join the event. What We'll Discuss Bitcoin Mining Basics: Understand the fundamentals of Bitcoin mining.Energy Market Dynamics: Explore how Bitcoin mining interacts with energy markets.Sustainable Innovations: Learn about our efforts to promote sustainability in Bitcoin mining.Sound Money: Discover how tamper-proof currency can enhance stability.Efficient Payment Rails: See how fast, neutral payment systems support humanitarian projects.Carbon Footprint: Compare Bitcoin's environmental impact with traditional banking. "We're excited to host this event and dive into the critical topics of Bitcoin

World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye