Leading Edge Materials Announces Filing of Preliminary Economic Assessment Report for Woxna Graphite Anode Project
Vancouver, July 26, 2021 – Leading Edge Materials Corp. (“Leading Edge Materials” or the “Company”) (TSXV: LEM) (Nasdaq First North: LEMSE) (OTCQB: LEMIF) is pleased to announce that the technical report for its Woxna Graphite project (the “Project”) titled “NI 43-101 Technical Report – Woxna Graphite” with effective date June 9, 2021, has been filed under the Company’s profile on SEDAR today (the “Report” or “PEA”). The Report supports the disclosure in the Company’s news release dated June 9, 2021. All figures in the Report are US dollars unless otherwise specified.
The news release on June 9, 2021, presented these highlights of the Report:
Main PEA Highlights
- The PEA indicates the potential viability of a Swedish operation producing battery grade graphite anode material utilizing an existing graphite mine and concentrator with the addition of a value-add processing facility offsite;
- The proposed process route in the PEA uses a thermal purification process which, combined with access to low cost hydropower offers a low carbon footprint for the Project to be further demonstrated in an upcoming life cycle assessment (LCA) report (Preliminary LCA results released June 21, 2021). The PEA also focused on improved waste management process for tailings further improving the sustainability ambitions of the Project;
- The Report shows a financially robust Project with average annual EBITDA of $49m and a pre-tax Internal Rate of Return (IRR) of 42.9%;
- The PEA utilizes one out of four deposits currently owned by Woxna under granted exploitation concessions, where two of the other deposits also have indicated and inferred mineral resource estimates offering potential upside for further expansion in future development or studies;
Project Financial Highlights
- Pre- and Post-tax Net Present Value (NPV) of $317m and $248m using an 8% discount rate;
- Pre- and Post-tax IRR of 42.9% and 37.4%;
- Accumulated project revenues of $1,425m;
- Average annual EBITDA of $49m;
- Initial Capital Expenditures (CAPEX) of $121m;
- Pre-tax Payback Period from first production of 2.24 years; and
- Operating cost per tonne of coated spherical purified graphite (CSPG) of $2,519 after revenue credit from micronized graphite product
Operational Highlights
- Life of Project (LOP) is 19 years;
- Life of Mine (LOM) is 15 years;
- LOM average annual plant feed of 159,967 tonnes;
- LOM average annual CSPG product 7,435 tonnes;
- LOM average annual micronized graphite product 8,421 tonnes; and
- LOM average strip ratio of 3.7:1
The PEA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized.
The PEA was prepared by Zenito Limited in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects and is now available on the Company’s website (www.leadingedgematerials.com) and profile on SEDAR (www.sedar.com).
Qualified Persons for the PEA
- Zenito Limited (Zenito) - an independent firm of engineering consultants focussed on minerals processing and infrastructure projects, Zenito is engaged as the lead PEA consultant and for the processing and infrastructure. The Zenito Qualified Person is Christopher Stinton, BSc (Hons), CEng MIMMM.
- ReedLeyton Consulting Limited (ReedLeyton) - an independent firm specialising in estimation of mineral resources commissioned to review, validate, and update the PEA Mineral Resource statements. The ReedLeyton Qualified Person is Geoffrey Reed, B App Sc, MAusIMM (CP), MAIG.
- M.Plan International Limited (MPlan) - an independent firm of engineering consultants commissioned to review and update the PEA mine engineering. The MPlan Qualified Person is Mathieu Gosselin, Eng.
- Golder Associates AB (Golder) - commissioned to review the project environmental scope and review and design of the TSF to accommodate the production from the upgraded Woxna Concentrator and CVAP. The Golder Qualified Person is Henning Holmström, MSc, PhD, MAusIMM, MAIG.
ReedLeyton, MPlan, Golder and Zenito Qualified Persons are all independent as defined by NI 43-101, and have contributed to their corresponding sections of the PEA, and have reviewed and approved the scientific, technical and economic information contained in this news release.
On behalf of the Board of Directors,
Leading Edge Materials Corp.
Filip Kozlowski, CEO
For further information, please contact the Company at:
info@leadingedgematerials.com
www.leadingedgematerials.com
Follow us
Twitter: https://twitter.com/LeadingEdgeMtls
Linkedin: https://www.linkedin.com/company/leading-edge-materials-corp/
About Leading Edge Materials
Leading Edge Materials is a Canadian public company focused on developing a portfolio of critical raw material projects located in the European Union. Critical raw materials are determined as such by the European Union based on their economic importance and supply risk. They are directly linked to high growth technologies such as batteries for electromobility and energy storage and permanent magnets for electric motors and wind power that underpin the clean energy transition towards climate neutrality. The portfolio of projects includes the 100% owned Woxna Graphite mine (Sweden), Norra Kärr HREE project (Sweden) and the 51% owned Bihor Sud Nickel Cobalt exploration alliance (Romania).
About Zenito
Zenito is a UK based multidisciplinary engineering consultancy specializing in the design of mineral processing plants and associated infrastructure. (www.zenito.co.uk)
Additional Information
The information was submitted for publication through the agency of the contact person set out above, on July 26, 2021 at 5.30 am Vancouver time.
Leading Edge Materials is listed on the TSXV under the symbol “LEM”, OTCQB under the symbol “LEMIF” and Nasdaq First North Stockholm under the symbol "LEMSE". Mangold Fondkommission AB is the Company’s Certified Adviser on Nasdaq First North and may be contacted via email CA@mangold.se or by phone +46 (0) 8 5030 1550.
Reader Advisory
This news release may contain statements which constitute “forward-looking information” under applicable Canadian securities laws, including predictions, projections and forecasts. Forward-looking information includes, but are not limited to, statements that address activities, events or developments that the Company expects or anticipates will or may occur in the future, including such things as the results of the PEA, mineral resource estimates,the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, permitting time lines, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage and with respect to the results of the PEA, including future Project opportunities, future operating and capital costs, closure costs, the projected NPV, IRR, timelines, and the ability to obtain the requisite permits, economics and associated returns of the Project, the technical viability of the Project, the market and future price of and demand for graphite, the environmental impact of the Project, and the ongoing ability to work cooperatively with stakeholders,including the local levels of government. as well as plans, intentions, beliefs and current expectations of the Company, its directors, or its officers with respect to the future business activities of the Company.
The words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and similar expressions, as they relate to the Company, or its management, are intended to identify such forward-looking information. Investors are cautioned that any such forward-looking information is not a guarantee of future business activities and involves risks and uncertainties, and that the Company’s future business activities may differ materially from those in the forward-looking information as a result of various factors, including, but not limited to, success of the appeals process; fluctuations in market prices; successes of the operations of the Company; continued availability of capital and financing; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfil expectations and realize the perceived potential of the Project; changes in project parameters as plans continue to be refined; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties; the failure of contracted parties to perform; other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of exploration and general economic, market or business conditions, as well as those factors disclosed in the Company's publicly filed documents. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurances that such information will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. The Company does not assume any obligation to publicly update or revise any forward-looking information except as required under the applicable securities laws.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this news release.
Attachment
To view this piece of content from www.globenewswire.com, please give your consent at the top of this page.To view this piece of content from ml-eu.globenewswire.com, please give your consent at the top of this page.
About GlobeNewswire by notified
GlobeNewswire by notified is one of the world's largest newswire distribution networks, specializing in the delivery of corporate press releases financial disclosures and multimedia content to the media, investment community, individual investors and the general public.
Subscribe to releases from GlobeNewswire by notified
Subscribe to all the latest releases from GlobeNewswire by notified by registering your e-mail address below. You can unsubscribe at any time.
Latest releases from GlobeNewswire by notified
Iveco Group signs a 150 million euro term loan facility with Cassa Depositi e Prestiti to support investments in research, development and innovation11.6.2024 12:00:00 CEST | Press release
Turin, 11th June 2024. Iveco Group N.V. (EXM: IVG), a global automotive leader active in the Commercial & Specialty Vehicles, Powertrain and related Financial Services arenas, has successfully signed a term loan facility of 150 million euros with Cassa Depositi e Prestiti (CDP), for the creation of new projects in Italy dedicated to research, development and innovation. In detail, through the resources made available by CDP, Iveco Group will develop innovative technologies and architectures in the field of electric propulsion and further develop solutions for autonomous driving, digitalisation and vehicle connectivity aimed at increasing efficiency, safety, driving comfort and productivity. The financed investments, which will have a 5-year amortising profile, will be made by Iveco Group in Italy by the end of 2025. Iveco Group N.V. (EXM: IVG) is the home of unique people and brands that power your business and mission to advance a more sustainable society. The eight brands are each a
DSV, 1115 - SHARE BUYBACK IN DSV A/S11.6.2024 11:22:17 CEST | Press release
Company Announcement No. 1115 On 24 April 2024, we initiated a share buyback programme, as described in Company Announcement No. 1104. According to the programme, the company will in the period from 24 April 2024 until 23 July 2024 purchase own shares up to a maximum value of DKK 1,000 million, and no more than 1,700,000 shares, corresponding to 0.79% of the share capital at commencement of the programme. The programme has been implemented in accordance with Regulation No. 596/2014 of the European Parliament and Council of 16 April 2014 (“MAR”) (save for the rules on share buyback programmes set out in MAR article 5) and the Commission Delegated Regulation (EU) 2016/1052, also referred to as the Safe Harbour rules. Trading dayNumber of shares bought backAverage transaction priceAmount DKKAccumulated trading for days 1-25478,1001,023.01489,100,86026:3 June 20247,0001,050.597,354,13027:4 June 20245,0001,055.705,278,50028:6 June20243,0001,096.273,288,81029:7 June 20244,0001,106.174,424,68
Landsbankinn hf.: Offering of covered bonds11.6.2024 11:16:36 CEST | Press release
Landsbankinn will offer covered bonds for sale via auction held on Thursday 13 June at 15:00. An inflation-linked series, LBANK CBI 30, will be offered for sale. In connection with the auction, a covered bond exchange offering will take place, where holders of the inflation-linked series LBANK CBI 24 can sell the covered bonds in the series against covered bonds bought in the above-mentioned auction. The clean price of the bonds is predefined at 99,594. Expected settlement date is 20 June 2024. Covered bonds issued by Landsbankinn are rated A+ with stable outlook by S&P Global Ratings. Landsbankinn Capital Markets will manage the auction. For further information, please call +354 410 7330 or email verdbrefamidlun@landsbankinn.is.
Relay42 unlocks customer intelligence with a new insights and reporting module, powered by Amazon QuickSight11.6.2024 11:00:00 CEST | Press release
AMSTERDAM, June 11, 2024 (GLOBE NEWSWIRE) -- Relay42, a leading European Customer Data Platform (CDP), is leveraging Amazon QuickSight to power its new real-time customer intelligence, reporting, and dashboard module. Harnessing the breadth and quality of customer data, the new Insights module empowers marketing teams to dive deep into customer behaviors and gain invaluable insights into the performance of their marketing programs across all online, offline, paid, and owned marketing channels. Preview of the Relay42 Insights module, in pre-beta version Key capabilities of the Relay42 Insights module include: Deep insights into customer behaviors: With the Relay42 Insights module, marketers can ask unlimited questions about their data and gain a deeper understanding of how to serve their customers more effectively. Simplicity with AI-powered querying: Marketers can use artificial intelligence to query their data using natural language search, reducing the reliance on data scientists. Us
Metasphere Labs Announces X Spaces Event on the Topic of Green Bitcoin Mining and Sound Money for Sustainability11.6.2024 10:30:00 CEST | Press release
VANCOUVER, British Columbia, June 11, 2024 (GLOBE NEWSWIRE) -- Metasphere Labs Inc. (formerly Looking Glass Labs Ltd., "Metasphere Labs" or the "Company") (Cboe Canada: LABZ) (OTC: LABZF) (FRA: H1N) is thrilled to announce an engaging Twitter Spaces event on Green Bitcoin mining, energy markets, and sustainability on July 3, 2024 at 2 p.m. ET. Follow us on X at MetasphereLabs for updates and to join the event. What We'll Discuss Bitcoin Mining Basics: Understand the fundamentals of Bitcoin mining.Energy Market Dynamics: Explore how Bitcoin mining interacts with energy markets.Sustainable Innovations: Learn about our efforts to promote sustainability in Bitcoin mining.Sound Money: Discover how tamper-proof currency can enhance stability.Efficient Payment Rails: See how fast, neutral payment systems support humanitarian projects.Carbon Footprint: Compare Bitcoin's environmental impact with traditional banking. "We're excited to host this event and dive into the critical topics of Bitcoin